Files
hq/01-RESEARCH
jschoubben b4365d8aa4 research 006: the mesh designed from nothing
A skeleton laid out against the stated requirements rather than derived
from the current shape: four tiers, repositories at the root, and a
dependency rule that only points downward.

Four moves the current shape does not have.

The substrate is applied by the agent from a pinned bundle, not delivered
by the pipeline. That is the bootstrap circularity removed rather than
worked around — the first node is the ordinary path with no control plane
on the other end, which also makes it the cheapest lab scenario instead of
the one nobody exercises.

One agent binary with a detected capability profile — managed, user, edge.
A phone becomes a capability question rather than a platform question, so
it needs no second implementation. Modules declare which profiles they can
land on, and an impossible assignment fails at declaration.

Connectivity becomes a context. ADR 0015 names nine and none owns the
overlay, resolver, firewall or ingress, while research 005 measured
reachability as the only cluster in the catalogue that genuinely changes
together under one intent. Gap and evidence point the same way. That is an
addition to an accepted record, so it needs its own record and is not
written here.

Feature splits into artifact (built once per version) and part (selected
per node). The conflation of those two cardinalities under one word is
what makes the delivery pipeline hard to reason about.

Also makes explicit in how-we-build that the main-branch rule covers this
repository too. The rule already said 'without exception'; nothing was
amended, so nothing is recorded.
2026-08-23 19:25:29 +02:00
..

01-RESEARCH

Investigations that have not yet hardened into design.

Structure

Each effort lives in NNN-descriptive-name/ and must contain 00-overview.md, carrying its state in YAML frontmatter and a prose summary below it:

---
status: active | graduated | abandoned
initiated: YYYY-MM-DD
touches: []          # design docs, subsystems or areas the effort bears on
became: []           # required when status is terminal — what it turned into
---

The prose says what is being investigated, why, and what it touches. It does not restate the status — status lives in one place, and two places is one too many.

Further documents in the same folder hold the work itself: notes, evidence, option analyses, draft designs.

Lifecycle

status Meaning
active Investigation in progress.
graduated Checked against 00-META, decided in 02-DECISIONS/, and specified in 03-DESIGN — see became:.
abandoned Stopped or superseded. Nothing is deleted.

An effort graduates by producing a decision record and a 03-DESIGN entry. It is abandoned in place — never deleted. What was rejected, and why, is the more expensive half to rediscover.

Starting and closing efforts is playbook territory: 00-META/process/01-research.md and 02-graduation.md.

Rules

  • Markdown only. Do not skip or reuse a sequence number.
  • Evidence, not assertion. An effort that measured nothing has not finished.
  • Research describes real observations but never identifies the mesh it observed. The shape of a finding survives anonymisation intact.