Skills take the hq- prefix: they are HQ process workflows, not mesh workflows, and HQ is company-scoped now. hq-new-research, hq-graduate, hq-new-issue, hq-diagnose, hq-amend-design, hq-handoff, hq-sync-constitution, hq-status. Forward-looking prose becomes Novox Mesh or simply the mesh — the root README, AGENTS.md, the 00-META README, the mission's module example, and one to-be document that addressed 'someone working on HAL'. Three categories deliberately keep HAL, per ADR 0027: The monorepo is still called hal on the forge. repos.md, every code: field and every located-in: field name a repository that exists under that name, and renaming them in prose would make them false. The as-is layer and the research that measured it describe the system that runs, and that system is called HAL. 124 modules, 9 daemons, a dead containerised node — those are observations, not intentions. Records 0001-0026 are immutable. A record says what was decided when it was decided, and no record is edited for a name. Also repoints ADR 0022's link at the renamed skill — a path fix, which the immutability rule permits, not a change of meaning.
2.0 KiB
name, description
| name | description |
|---|---|
| hq-graduate | Use when a research effort in HQ concludes and becomes design, or when a design must change. Triggers on "graduate this research", "this is decided", "write the ADR", "close the effort", "the design changed". |
hq-graduate
Closes a research effort into a decision and a design, or amends an existing design.
Authoritative playbook:
00-META/process/02-graduation.md — read
it; this skill adds only the scaffolding.
Steps
- Check against GENESIS —
mission.md,context.md,effect.md. If the conclusion conflicts, say which is wrong, in writing, before proceeding. - Write the decision record in
02-DECISIONS/, next free number, frontmatter per02-DECISIONS/README.md.reconstructed: false— this one is being taken, not recovered. Record the rejected options. - Write the design under
03-DESIGN/01-to-be/withlayer: to-be,status: designed, emptycode:, today'supdated:, anddecisions:pointing at the record. - Close the effort — the research
00-overview.mdgetsstatus: graduatedandbecame:pointing at both.
Amending an existing design
A design changes only through a decision. Write the record first; if it reverses an earlier
one, set that record's status: superseded and superseded-by: — never edit its text.
Then edit the design and set updated:.
When something ships
Write or update the matching 03-DESIGN/00-as-is/ document so it describes what now runs,
including anything that shipped differently from the intent. Set the to-be document's
status: implemented and its code:. The to-be document does not move — both stand.
status: implemented must be defensible from the owning repository's main branch. If it
cannot be checked, it is in-progress.
Do not
- Do not move a to-be document into
00-as-is/. - Do not edit an as-is document to describe an intention.
- Do not change a decision record's meaning. Supersede it.