Files
hq/01-RESEARCH
jochen c8cbbcfb8a Research 015: reopen the comparison — the premise for narrowing to one candidate was false
SeaweedFS was scoped as primary because it looked like the only candidate preserving
OIDC console login. Measured: its admin UI is Apache-2.0 but its identity-provider
integration is not — console SSO sits behind the per-TB commercial licence, alongside
point-in-time recovery and automatic EC repair. The free build gives OIDC on the S3 API
via STS and a console authenticated by local username and password.

So the answer to the gating question is that no candidate preserves the current feature
set for free, which this effort had written down as a possible outcome. Reopened across
three candidates with the requirement-by-requirement evidence in 01.

Two corrections to what the overview recorded. RustFS is not a binary-level drop-in
retaining existing data: API and on-disk compatibility are separate paths and the on-disk
one is preview-scoped. And it carries an open defect in the credential path the bucket
provision depends on, which gates it specifically.

Nothing graduates before two measurements named in 01: whether an authenticating proxy
is an acceptable answer to console SSO, and which S3 endpoints consumers actually call —
the latter because Garage does not implement the full span and cannot be ranked until
that is counted.
2026-09-24 16:10:33 +02:00
..

01-RESEARCH

Investigations that have not yet hardened into design.

Structure

Each effort lives in NNN-descriptive-name/ and must contain 00-overview.md, carrying its state in YAML frontmatter and a prose summary below it:

---
status: active | graduated | abandoned
initiated: YYYY-MM-DD
touches: []          # design docs, subsystems or areas the effort bears on
became: []           # required when status is terminal — what it turned into
---

The prose says what is being investigated, why, and what it touches. It does not restate the status — status lives in one place, and two places is one too many.

Further documents in the same folder hold the work itself: notes, evidence, option analyses, draft designs.

Lifecycle

status Meaning
active Investigation in progress.
graduated Checked against 00-META, decided in 02-DECISIONS/, and specified in 03-DESIGN — see became:.
abandoned Stopped or superseded. Nothing is deleted.

An effort graduates by producing a decision record and a 03-DESIGN entry. It is abandoned in place — never deleted. What was rejected, and why, is the more expensive half to rediscover.

Starting and closing efforts is playbook territory: 00-META/process/01-research.md and 02-graduation.md.

Rules

  • Markdown only. Do not skip or reuse a sequence number.
  • Evidence, not assertion. An effort that measured nothing has not finished.
  • Research describes real observations but never identifies the mesh it observed. The shape of a finding survives anonymisation intact.