0030, found by asking what the conversion actually needs rather than by reviewing anything. The host deleted a directory and everything under it when it stopped being declared — which happens when a module is unassigned, or when a manifest is edited to move a data folder, which is the exact operation this plan needs. A database's files, a mail spool. The report said "removed". A directory still holding something is now kept and said so. No flag and nothing to remember: emptiness is the test, and it works because the removal order was already right — the mesh's own contents are gone by the time the directory is reached, so what remains is by definition something nobody declared. The plan now says data outranks its own ordering: copy, read back through the service that owns it, and only then point anything at the new location. Never move and then check. And it records where this starts — the node holding all the production data — with what that costs stated rather than argued with. Everything proven so far was proven on machines that could be destroyed and raised again. A scenario proves the mechanism, not the state on that machine.
03-DESIGN
The authoritative specification. Implementation is built against what is written here.
Two layers
| Folder | What it is |
|---|---|
00-as-is/ |
The mesh that exists today. Shipped behaviour, described as it is — including behaviour nobody would choose again. |
01-to-be/ |
The mesh being built toward. Every statement traceable to a record in 02-DECISIONS/. |
They are never mixed. A statement about the future does not belong in an as-is document, and an as-is document is never edited to describe an intention.
When a to-be design ships, it does not move. Its as-is counterpart is written or updated,
the to-be document's status becomes implemented, and both stand — one describing what runs,
the other recording what was intended. Deleting the intention loses the reasoning, which is
the expensive half.
Frontmatter
Every design document (not the READMEs) carries:
---
layer: as-is | to-be
status: designed | in-progress | implemented | abandoned
code: [] # owning code repo(s), from 00-META/repos.md
updated: YYYY-MM-DD # date of the last status change, not of text edits
decisions: [] # 02-DECISIONS/ records this document rests on
---
For an as-is document, status: implemented is the normal state — it describes something that
runs — and code: names where that implementation lives.
Status changes when implementation state changes, never because design text was edited. An
implemented claim must be defensible from the owning repository's main branch, not from
intent. If it cannot be checked, it is in-progress.
Cross-cutting views are generated from this frontmatter by the hq-status skill and never
written to disk.
What belongs here
Functional analysis, architectural description, and specification — prose and diagrams
only, no code. A manifest field may be named; a manifest may not be pasted. A document
enters the to-be layer only after the decision behind it is recorded in 02-DECISIONS/
and the research that produced it is closed.
Subfolders are encouraged where a layer grows enough to need them.