Files
hq/03-DESIGN
mesh-adminandClaude Opus 5.5 e5b98e3b0a
mesh/merge-gate head e5b98e3b0a42 merged into trunk fd416cef91bf — pass: the change touches no module of the mesh's graph
mesh/repo-check head e5b98e3b0a42 merged into trunk fd416cef91bf — pass: its merge-check.sh passed
mesh/delivery delivered
Design 57: answer the second review of hq#350
The word setting waits for R2, P3 waits for F3, the group's order is declared with after: lines, and a stop's fix is a new merge.

Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
2026-10-13 23:53:59 +00:00
..

03-DESIGN

The authoritative specification. Implementation is built against what is written here.

Two layers

Folder What it is
00-as-is/ The mesh that exists today. Shipped behaviour, described as it is — including behaviour nobody would choose again.
01-to-be/ The mesh being built toward. Every statement traceable to a decision record in the knowledge base (ADR 0290).

They are never mixed. A statement about the future does not belong in an as-is document, and an as-is document is never edited to describe an intention.

When a to-be design ships, it does not move. Its as-is counterpart is written or updated, the to-be document's status becomes implemented, and both stand — one describing what runs, the other recording what was intended. Deleting the intention loses the reasoning, which is the expensive half.

Frontmatter

Every design document (not the READMEs) carries:

---
layer: as-is | to-be
status: designed | in-progress | implemented | abandoned
code: []                 # owning code repo(s), from 00-META/repos.md
updated: YYYY-MM-DD      # date of the last status change, not of text edits
decisions: []            # the decision records this document rests on, each "ADR NNNN"
---

For an as-is document, status: implemented is the normal state — it describes something that runs — and code: names where that implementation lives.

Status changes when implementation state changes, never because design text was edited. An implemented claim must be defensible from the owning repository's main branch, not from intent. If it cannot be checked, it is in-progress.

Cross-cutting views are generated from this frontmatter by the hq-status skill and never written to disk.

What belongs here

Functional analysis, architectural description, and specification — prose and diagrams only, no code. A manifest field may be named; a manifest may not be pasted. A document enters the to-be layer only after the decision behind it is recorded in the knowledge base and the research that produced it is closed.

Subfolders are encouraged where a layer grows enough to need them.