jochen a6c0f002a5 To-be 45 in progress; issue 269: the controller cannot write a cancelled set
Phase 0 is being built in mesh-controller and mesh-host. Granting the
controller its own buckets showed that its grant never covered the work
queues' cancelled sets, so every cancel times out.