The connectivity design still said a hub cannot be filtered — a gap recorded in the morning and closed in the afternoon, left standing as though it were current. Worse than a stale date: it would send somebody away from something that works. `restart-on` was described nowhere, including the part added today that lets a service reflect a file another module put on the machine. A rule the host enforces and no document mentions is a rule nobody can rely on. And nine of fifteen design documents claimed an `updated:` older than their last change, some by a week. That field is what cross-cutting views are generated from, so it is not decoration.
6.7 KiB
layer, status, code, updated, decisions
| layer | status | code | updated | decisions | ||
|---|---|---|---|---|---|---|
| to-be | designed |
|
2026-08-29 |
|
Work breakdown — the decomposition
How ADR 0001 gets built, in what order, and where a human must look.
Ordering is not preference. Each phase removes a constraint the next one needs gone.
Rules of engagement
These exist so the work can run largely unattended without accumulating the kind of damage this refactor is meant to remove.
Autonomous by default
An agent may, without asking:
- read anything, measure anything, query any database read-only
- create branches, write code and tests, open pull requests
- run the test suite and typechecks
- write and update
hq/documents
Always stop and ask
- destroying or overwriting data — dropping a table, deleting a provision, rotating a live credential, removing a module from a node
- merging anything — every merge is a human checkpoint, without exception
- a decision the ADRs do not already answer — record the question in the relevant research effort rather than picking and moving on
- any change to
hq/00-META— it is stable by nature
Definition of done for every task
- tests written and failing first, then passing
- typecheck clean in every package the change touches
- the local mesh (Phase 0) comes up, and the behaviour is demonstrated in it
hq/updated if the task changed or answered anything documented- deployed, and delivery verified on every node — not "the pipeline was green"
Non-negotiables carried from the current system
- Never edit mesh-managed files on disk. Use the owning tool.
- Never write to production databases directly. Migrations for schema, application code for data.
- Every schema change ships twice — consolidated schema and an incremental migration.
- Expand, then contract. Add the new shape, migrate, verify, and only then remove the old one — never in a single step.
- A green pipeline proves transport, not effect. Verify the effect.
Phase 0 — A mesh that runs locally (prerequisite)
Nothing else starts until this exists. Every fault this refactor addresses was found in production because there was nowhere else to find it.
| # | task | done when |
|---|---|---|
| 0.1 | Container image for a node runtime | a node process starts in a container and registers |
| 0.2 | Compose topology: broker, registry DB, object store, n nodes | up yields a mesh that elects a provider node and settles |
| 0.3 | Seed a minimal mesh: nodes, one module, one provision | a module deploys end-to-end with no external service |
| 0.4 | Run the pipeline inside it | a push-equivalent produces a cascade and a deployed artifact |
| 0.5 | Fixtures for the failure modes already known | credential rotation reaching a running session; a provider deploy rotating a shared credential; a migration that ships nothing — each reproducible on demand |
Checkpoint: a human confirms the local mesh reproduces at least one bug from 2026-08-22 before any decomposition begins.
Phase 1 — Make the model expressible
The decomposition is impossible while a feature is a singleton per module.
| # | task | done when |
|---|---|---|
| 1.1 | Decision record — named features, per-node opt-in (next free number) | accepted |
| 1.2 | Manifest: declared features: with type + directory |
a module declares two of one kind and both build |
| 1.3 | Selection: always / optional |
a node installs a subset; artifacts stay selection-blind |
| 1.4 | requires: moves onto the feature |
a schema feature's database is not provisioned where the feature is not installed |
| 1.5 | Assignment carries the opted-in feature set | opting a node in requires no rebuild |
Checkpoint: one existing module converted to declared features, deployed, verified — before any others follow.
Phase 2 — Draw the boundary the domain already has
Cheapest first, and each one proves the extraction pattern before the expensive ones.
| # | task | extracted from | risk |
|---|---|---|---|
| 2.1 | hal/knowledge — one store, review workflow ported |
hippocampus + noxflow knowledge_* |
low — additive |
| 2.2 | hal/stream — the record; notifications and messaging as views |
axon, synapse, notifications, meetings, conversations | medium |
| 2.3 | hal/agents — identity, licence, runs, memory, thoughts |
noxflow agents, hal/thoughts |
high — touches credentials |
| 2.4 | hal/work — what remains of noxflow |
noxflow tasks | medium |
| 2.5 | hal/ai — one module per provider, each providing a model provider |
hal/claude* |
medium |
Each extraction is expand-then-contract: new context alongside, dual-write, verify, cut over, remove. Never a move commit.
Checkpoint: after 2.1, a human confirms the extraction pattern before 2.2 begins. After 2.3, a human confirms credentials still reach every agent on every node.
Phase 3 — Reclaim the kernel
Only possible once domains have modules to own their code.
| # | task | done when |
|---|---|---|
| 3.1 | Move work-domain code out of hal/sdk |
workflow-engine.ts, task-commands.ts live in hal/work |
| 3.2 | Move provider code out | claude-credentials.ts lives in hal/ai |
| 3.3 | Move delivery code out | feature handlers, artifact manager, build executor live in hal/delivery |
| 3.4 | Decide the residue | ADR: what hal/sdk keeps (open question 4) |
Measure: hal/sdk line count, tracked per task. Today: 34,636 across 155
files.
Phase 4 — Separate what the mesh runs from the mesh
| # | task | done when |
|---|---|---|
| 4.1 | Decide the destination (open question 3) | ADR accepted |
| 4.2 | Cross-repository dependency resolution proven | a catalogue module builds against a published @hal/* |
| 4.3 | Move the 91 catalogue modules | this repository contains only mesh contexts |
Checkpoint: move one application first and run it for a week before the rest follow.
Sequencing constraints
- 0 before everything. Unverifiable refactors are how this list got long.
- 1 before 2. Extracting into contexts without per-node features recreates the module count inside the new names.
- 2 before 3. A domain can only own its shared code once the domain has a module.
- 2.3 after 2.1 and 2.2. Agents touch credentials; do it once the pattern is proven on cheaper contexts.
- 4 last. It is the only phase that is pure movement, so it is the only one safe to defer indefinitely.
What "done" looks like
Eight contexts. hal/sdk holding only what is genuinely cross-cutting. A mesh that stands
up on a laptop. A module count that grows only when the domain does.