jschoubben cb1954e7b5 Accept 0024, and rewrite the work breakdown around what is actually being done
**0024 accepted.** Model access was decided, built, and proven in the
lab, and two design documents rest on it; only the status had never
moved. The gate is green again.

**The work breakdown rewritten.** It planned a decomposition of the
existing system in place — extract contexts, declared features, shrink
the shared library. That is not the work. A replacement is being built
beside it, and only the old Phase 0 survived contact with reality, so
the one document meant to say what happens next was describing a system
being retired.

Now ordered by what "modules move across one at a time until the old
registry is off" actually requires:

- Phase 0 is marked done against the twenty-two lab assertions, **and
  carries its own limitation**: every module exercised was written to
  test the mechanism, so the vocabulary was shaped by its own fixtures.
- Phase 1 is the vocabulary gaps found by asking what real modules
  need — an object-store provision, a session as a licence consumer, a
  network shape with ordering, public certificate issuance.
- Phase 2 is one module, then a week of running it, because the point of
  going first is to find what Phase 1 missed.
- Phase 3 picks modules that each prove something the first did not; the
  mail system is last because it is the one that may send work back into
  the declaration language.
- Phase 4 is switching the registry off, named as a phase so it is not
  mistaken for the goal.

Keeps the rules of engagement unchanged — they were about how work is
done, not what it is — with one addition: stop and ask before anything
that touches a machine outside the lab.

Adds a section on keeping the list true, since the document it replaces
was wrong for weeks and nothing said so. A claim here is counted, not
reasoned, and a phase is done when the lab says so.
2026-08-31 17:25:27 +02:00
..

02-DECISIONS

Architecture decision records — the "why" trail behind the rules in 00-META and the specifications in 03-DESIGN.

Numbered 02 because a decision precedes the design it authorises. Research concludes, the decision is recorded here, and only then is the design written. Following the folder numbers walks the process in the order it happens.

One file per decision, numbered, never deleted. A superseded record has its status: changed and gains a pointer to what replaced it — its text is never edited. The reasoning that was rejected is the expensive half to rediscover.

The records run in the order the decisions were taken, oldest first.

Every decision is a record. There is no ledger and no index file — if a decision is worth recording it is worth a record, and if it is not worth a record it is not recorded (ADR 0019). A "decision" small enough to be one line is almost always a rule, and a rule belongs in 00-META/how-we-build.md, where it is enforced and keeps the incident that earned it.

Frontmatter

---
status: proposed | accepted | superseded
date: YYYY-MM-DD          # when the decision was taken, not when it was written down
deciders: name
reconstructed: true|false # true when the record was written after the fact from evidence
superseded-by:            # 02-DECISIONS/NNNN-....md, when status is superseded
extends:                  # 02-DECISIONS/NNNN-....md, when this record widens an earlier one
---

Body

# N. Title in plain language

## Context            what was true, with evidence
## Considered Options numbered, each with why it was rejected
## Decision           what was decided
## Consequences       what follows, including what got harder
## References         commits, pull requests, knowledge-base entries, prior art

State evidence, not assertion. "Zero of 124 modules declare brain as a dependency" outranks "the dependency rule is not followed".

Reconstructed records

Records 0001–0014 were written on 2026-08-23, after the decisions they describe. Records 0015 onward were taken as records. Those decisions were taken in implementation rather than in a document; the records state what was decided and the evidence it was decided from, and each carries reconstructed: true and says so in its first lines.

A reconstructed record is not a transcript. Where the deliberation is not recoverable, the options section states what the alternatives were and why the chosen one won on the evidence available — not a discussion that did not happen. Where a date is not establishable it says so rather than guessing.

Index

A number identifies a record and never changes. Records are referenced from outside this repository — code comments, commit messages — so a number that moves invalidates them silently. Renumbering once cost 96 references across two code repositories, and that is why the numbers are now fixed.

So the folder is in creation order, and the reading order lives here. It is generated from each record's topic: and written, because a reader looking at the folder on a forge sees the folder rather than a command. The objection to a written index is that it drifts — which is answered by checking it rather than by refusing to write one:

python3 00-META/checks/index.py --write    regenerate
python3 00-META/checks/index.py            fail if stale

What the mesh is

Its tiers, from the bottom up

What runs on them, and how it gets there

How it is built

How it is checked

How we work