The catalogue prepares its own schema instead of migrating at start
It brought its schema up inside its runtime, on every start. That made a schema it could not reach a crash loop rather than a stop, with the module graph keeping a gap and nothing saying so — which is how a whole morning's builds went unrecorded. The mesh now prepares this module's state before it starts this version and does not start it if that failed (novox/hq ADR 0135): the work moves to an entrypoint the image names in MESH_PREPARE, beside the entrypoints it already names. The reason it was at start — that a step blocking the apply would block the very apply bringing the overlay up — stopped being true when a step's failure became its module's business rather than the machine's (ADR 0136).
This commit is contained in:
@@ -37,6 +37,7 @@
|
||||
"rebuild-needed",
|
||||
"catching-up"
|
||||
],
|
||||
"prepares": true,
|
||||
"resources": [
|
||||
{
|
||||
"id": "mesh-state",
|
||||
|
||||
Reference in New Issue
Block a user