mesh/check pass 87fe2c45cfed on 26908a89506f | carried from 27a7757b970e, hq 3a5c4c7c4d9c | unit 2091 run, 2327 kept, 6 skipped | integration 2112 run…
A resolved issue whose delivery is held or failed is stuck, one merged and not delivered
is moving; a row the tracker did not answer, an answer that does not read and linked
issues cut by the list's limit are said as warnings instead of passing silently.
A lead's five-minute report and 'is design 47 nearing its end' were joined by hand from
the design file, the tracker and the deliveries. One verb now works the state out
(ADR 0424 §1), minimal for every five minutes, detailed for the report's tree.
Milestones are read from the design's table until the tracker's milestone records
(issue 1781) are delivered.