Commit Graph
8 Commits
Author SHA1 Message Date
mesh-adminandClaude Opus 5.5 48f0662fde Make the forge's tools act as an account of their own, not the administrator (issue 469, ADR 0365 clause 2)
mesh/merge-gate head 48f0662fdea2 merged into trunk 5ce2d07c7f47 — pass: builds gitea → novox; no bus step; every machine composes with the change as it di…
mesh/repo-check head 48f0662fdea2 merged into trunk 5ce2d07c7f47 — pass: its merge-check.sh passed, each part in its toolchain: merge-check.sh (go), merge-…
mesh/delivery delivered
The tools' token reached everything the administrator may do, so their boundary rested on their own guards.
The gitea module now makes a plain account, mesh-tools, with the admin login, gives it write on code, issues
and pull requests of every novox repository through one team, and mints the tools' token for it; the admin's
old token goes only after the new one is kept. The Go forge bundle sends that token, never the admin login.
The forge shows protection rules only to a repository administrator, so every check reads a branch's
protection from the branch. mesh-admin stays a ready author, so marks made before the move keep counting.

Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
2026-10-14 22:28:25 +00:00
jschoubben 5b20e419ec Count a ready mark only from a listed account, after the last push and the label (issue 722)
mesh/merge-gate head 5b20e419ec1f merged into trunk 7e3e62062bef — fail: builds gitea, mesh-delivery → novox; no bus step; a manifest the change touches fa…
mesh/repo-check head 5b20e419ec1f merged into trunk 7e3e62062bef — fail: its merge-check.sh failed: files asking for a setting without saying whether it is…
mesh/delivery superseded: a newer head of the same pull request
Review of #303: anyone who can comment could turn a stale label into a mark,
and a long thread hid the newest comment. The forge now reads the pull
request's whole timeline and takes a "ready at" comment only from the
accounts in the trusted setting ready-authors (default the mesh's own forge
account and the operator's), written after the label was last added and after
the last push; any other author is ignored and said in the log.
2026-10-14 21:45:39 +02:00
jschoubben 7e0001e304 Merge a pull request marked ready at its head once its checks pass (issue 722)
mesh/merge-gate out of date: judged against trunk 482232e8c51c, the trunk is now 7e3e62062bef; judged again on a recheck or when it is merged
mesh/repo-check out of date: judged against trunk 482232e8c51c, the trunk is now 7e3e62062bef; judged again on a recheck or when it is merged
mesh/delivery superseded: a newer head of the same pull request
The operator wants a reviewed pull request merged without a session calling
the merge tool again after every recheck. The reviewer marks it ready (label
mesh/ready and a comment "ready at <full head sha>"); the forge's open-pulls
read carries the mark, and mesh-delivery merges through gitea_merge_pull_request
at that head, in a group's order once its composed check passed. A push after
the mark clears it; a failed check is said on the pull request and as a
stalled line.
2026-10-14 21:23:26 +02:00
jschoubben 01d2ff7a46 Announce a merged pull request's branch, not its pull ref, so its delivery group is found (hq issue 578)
mesh/merge-gate head 01d2ff7a46bc merged into trunk 2fe5601397ae — pass: builds gitea → novox; no bus step; every machine composes with the change as it di…
mesh/repo-check head 01d2ff7a46bc merged into trunk 2fe5601397ae — pass: its merge-check.sh passed, each part in its toolchain: merge-check.sh (go), merge-…
mesh/delivery delivered
The merge tool deletes the branch after merging; the forge then reads head.ref as refs/pull/<n>/head and only
head.label names the branch. pull.merged carried the pull ref, so the controller found no group for the merge,
cut mesh-catalog #251's walk at once and walked it before mesh-controller #271's, against the group's order.
2026-10-12 20:57:14 +02:00
jschoubben 9d766b675d mesh-delivery: say a head whose merge check started and never answered (issue 438)
mesh/merge-gate pass: builds gitea, mesh-delivery → novox; no bus step; every machine composes with the change as it did without (4 of 4 compose)
mesh/repo-check pass: its merge-check.sh passed, each part in its toolchain: merge-check.sh (go), merge-check-typescript.sh (typescript)
mesh/delivery superseded: a newer head of the same pull request
The watch for unchecked heads counted any merge-check status as checked, pending
included, so a head left with a pending mesh/merge-gate, or never given
mesh/repo-check, waited unable to merge with nothing saying so. gitea_open_pulls
now gives each head status with its state and time, and the watch says a head
whose required check stays pending or unset past the delivery table's bound for
a check asked and not answered.
2026-10-11 02:16:34 +02:00
jochen 1dca181e03 Put every repository path through the segment helper, gitea_open_pulls's included
mesh/merge-gate pass: builds gitea → novox; no bus step; every machine composes with the change as it did without (4 of 4 compose)
mesh/repo-check pass: its merge-check.sh passed, each part in its toolchain: merge-check.sh (go), merge-check-typescript.sh (typescript)
mesh/delivery superseded: a newer delivery to the same trunk took over its walk
After merging #159 (issue 347): every /repos/<owner>/<name> the client builds
now takes its owner and name through one helper, whether they came from a
caller or from the forge's answer; the open-pulls fixture's shas are commits.
2026-10-09 13:41:35 +02:00
jochen 32d55beb47 Say a pull request nobody checks as a delivery held, owned by mesh-delivery (hq issue 347)
mesh/merge-gate pass: builds gitea, mesh-delivery → novox; no bus step; every machine composes with the change as it did without (4 of 4 compose)
mesh/repo-check pass: its merge-check.sh passed, each part in its toolchain: merge-check.sh (go), merge-check-typescript.sh (typescript)
mesh/delivery superseded: a newer delivery to the same trunk took over its walk
The confirmation review asked for the delivery domain's own vocabulary
instead of a provider standing. A gitea health check would need a `tools`
list (turning gitea's tools into seat verbs), a check of another kind
beside it, and would hold the forge's own deliveries at the first-node
gate; so the delivery's owner says it, with the word it already has.

- gitea_open_pulls (gitea): every open pull request from the forge itself,
  with what its base requires and the statuses its head has.
- mesh-delivery asks it every five minutes and keeps its own first-seen
  time per head (the forge's update time moves on every comment). A head
  on a base requiring mesh/merge-gate OR mesh/repo-check (hq requires only
  the second) with neither for ten minutes is a `stalled` line in state
  `unannounced`, which the controller raises as delivery.<id>.stalled (D14);
  H2 has nothing to close. Once announced it is a delivery of its own.
- The gitea-side watcher and its provider standing are gone.
2026-10-09 13:14:36 +02:00
jochen 67bce7e189 Announce a pull request opened after its push, and say one nobody checks (hq issue 347)
mesh/delivery superseded: a newer head of the same pull request
mesh/merge-gate pass: builds gitea → novox; no bus step; every machine composes with the change as it did without (4 of 4 compose)
mesh/repo-check pass: its merge-check.sh passed, each part in its toolchain: merge-check.sh (go), merge-check-typescript.sh (typescript)
The announcer read only the repositories whose update time moved since its
last pass, less a minute. Opening, reopening or retargeting a pull request
does not move a repository's update time, so a pull request opened more
than a minute after its push was never announced, never checked, and
nothing said so (mesh-sdk #14, 2026-10-09).

- Each pass also looks at every repository holding a pull request updated
  since the floor, by the forge's own search; every ten minutes, or when the
  search fails, at every repository.
- Every five minutes the forge is asked for every open pull request; one on
  a base requiring mesh/merge-gate whose head has had none for ten minutes
  is said as the forge failing that pull request's merge check (a provider
  standing, ADR 0224), which the controller keeps as a condition, and is
  recovered when a check arrives or it closes.
- The client refuses a pull request or issue number that is not one before
  asking the forge (a misnamed tool argument sent pulls/NaN).
2026-10-09 12:55:09 +02:00