The forge's holder set mesh/merge-gate pending as "the mesh is mapping this head onto its module graph" and nothing
changed it until the verdict, so a ten-minute controller check read as a stalled forge (issue 423). The holder now
says the head waits in the build queue since the local time it was announced; mesh-delivery follows the build
seat's started event and says the machine building it and since when, never over a verdict the forge holds.
mesh/merge-gate fail: builds mesh-delivery → novox; no bus step; a manifest the change touches fails the module check: mesh-delivery claims mesh-delivery a…
The operator's budget (a leaf module running everywhere within five minutes
of its merge, a core module within ten) cannot be held to without measuring
it. Each delivery now keeps its delivery time, class and phases from the
walk the controller says; 'times' answers the week's median and worst per
class, the deliveries over budget and their longest phase, and one
delivery's breakdown; 'deliveries' is headed by the same line. A phase the
walk could not measure stays unknown, never a zero. Measurement only.
The confirmation review asked for the delivery domain's own vocabulary
instead of a provider standing. A gitea health check would need a `tools`
list (turning gitea's tools into seat verbs), a check of another kind
beside it, and would hold the forge's own deliveries at the first-node
gate; so the delivery's owner says it, with the word it already has.
- gitea_open_pulls (gitea): every open pull request from the forge itself,
with what its base requires and the statuses its head has.
- mesh-delivery asks it every five minutes and keeps its own first-seen
time per head (the forge's update time moves on every comment). A head
on a base requiring mesh/merge-gate OR mesh/repo-check (hq requires only
the second) with neither for ten minutes is a `stalled` line in state
`unannounced`, which the controller raises as delivery.<id>.stalled (D14);
H2 has nothing to close. Once announced it is a delivery of its own.
- The gitea-side watcher and its provider standing are gone.
Merge order on a protected trunk was the whole proof; the review asked for ancestry. The gitea module
gains gitea_contains, a read-only compare of two commits (total_commits 0 is contained), and mesh-delivery
asks it once per pair, off the lock like its plan ask, keeping the answer on the delivery. A forge that
cannot say leaves the merge held, not covered. Merge order stays the cheap first filter.
A later delivery now carries a module only when its own check passed (so a merge held without a passing
check is closed only by one that passed), its walk is of its own merge commit on the same trunk, and its
steps say the module reached every machine running it, not one. The words say what is known: a later
merge that contains it was delivered.
Reading a pull request's mesh/merge-gate and mesh/repo-check meant scraping the controller's journal:
the forge clips each status to 140 characters and nothing returned the verdict whole. mesh-delivery
already keeps the verdict; it now keeps the machine that ran it, the layers' modules and the report,
and its checks verb joins that to the forge's statuses, read through a new gitea_commit_statuses tool
that also says whether the base's protection lets the commit merge.
after: novox/mesh-controller
One module answers 'did my change go out' for a commit and orders a
cross-repository change: one compiled state table, its state on the bus,
every transition said, noted on the commit and shown on the pull request.
The forge's holder gains the note, view and status tools it asks with, and
says closed pull requests and a merge's head and statuses.