mesh/check failed: novox: the check ran past its bound of 30m0s, stuck at: test the unit level of novox/mesh-catalog#458 on novox | 3ca48ff23005 on 89…
mesh-build-go, mesh-build-node and mesh-build-image refuse every fetch, test
and build, and say unhealthy, while their work or cache filesystem has less
than 20 GiB free (build-agent's floor), so the builder chooses another node
instead of filling this one. Each serves build_<x>_release, removing a
workspace once its caller's last step answered; a failed fetch removes its
own; a workspace never released goes two hours after its last use (ADR 0509)
in place of a day, never while a step holds it. Pins mesh-sdk's
fix/1839-build-floor (buildstep.Floor, buildstep.Workspaces).
After the build ended the module pushes the packed bundle or archive with mesh-sdk's
PushBlob under <module>/<artifact> by its digest, a candidate's as a trunk build's, and the
step answers artifact-store://<module>/<artifact>/blobs/<digest> instead of a path. A push
that fails fails the step not stored: <artifact>: <the store's words>. The packed bytes are
never written to the node. The manifest requires artifact-store and places its address.
Each run step goes through mesh-sdk's buildstep.Isolated: no network, none of the account,
the workspace read-write, the Go caches beneath a throwaway layer unless the build step is
told publish (a trunk build). The integration level runs its store, its bus and its tests in
one shut-off process (this program again, level <spec>), so they reach each other and
nothing else. build_go_test takes a -run pattern (a try's tests). The module declares the
bubblewrap package and refuses a step, unhealthy, while bwrap is missing or older than 0.10.
The proof test runs a probe test through the real unit level.
mesh/merge-gate head c33b83dce7d5 merged into trunk 940594b07478 — pass: builds mesh-build-go, mesh-build-node → g14, novox, shanks; no bus step; every mac…
mesh/repo-check head c33b83dce7d5 merged into trunk 940594b07478 — pass: its merge-check.sh passed, each part in its toolchain: merge-check.sh (go), merge-…
mesh/delivery covered: a later merge that contains it was delivered: novox/mesh-catalog@e023f69989ab (merged as b5dbfbb7 into main, walk plan-17925769516…
mesh/merge-gate head c7e892ca63b3 merged into trunk 82649bc770d1 — pass: builds mesh-build-go, mesh-build-node, sent nowhere; no bus step; every machine co…
mesh/repo-check head c7e892ca63b3 merged into trunk 82649bc770d1 — pass: its merge-check.sh passed, each part in its toolchain: merge-check.sh (go), merge-…