Merge order on a protected trunk was the whole proof; the review asked for ancestry. The gitea module
gains gitea_contains, a read-only compare of two commits (total_commits 0 is contained), and mesh-delivery
asks it once per pair, off the lock like its plan ask, keeping the answer on the delivery. A forge that
cannot say leaves the merge held, not covered. Merge order stays the cheap first filter.
A later delivery now carries a module only when its own check passed (so a merge held without a passing
check is closed only by one that passed), its walk is of its own merge commit on the same trunk, and its
steps say the module reached every machine running it, not one. The words say what is known: a later
merge that contains it was delivered.
A held delivery asked a person a question with no right answer: four hq merges that build nothing,
merges adding a module the controller sends nowhere, controller merges whose change a later walk of
the same trunk already delivered, and a group member held because its composed check had not yet
answered. Only stop could end them, which marks a delivered change as an error on its pull request.
- A merge whose plan moves no module (nothing, or only a new module sent nowhere) is delivered at once.
- A new final state, covered: every module a merge moves was sent by a finished walk of a later merge
into the same trunk, which contains it. Shown as success on the pull request; a group counts it as
delivered.
- A group member waits published while its composed check is asked and unanswered, and a member held
for it is lifted back to published once it passes for the heads that merged.
Read again each tick, so the deliveries already held end by themselves after the rollout.
A group whose order rules disagreed was refused as "its order contradicts
itself" with only the member ids: nobody could see which rules clashed or
what to write to resolve it. The controller now resolves rules by
precedence (hq ADR 0249) and answers, per pair, the rules it won over, and
per contradiction no precedence resolves, both rules and how to declare
the order. mesh-delivery keeps both, lists them in groups and the plan
note, and refuses a group by those words; a cycle through more members
names the pairs in it. An older controller's answer reads as before.
A recheck asks of the head the forge already judged, and the forge keeps
the newest status of each context on it. Nobody reset mesh/merge-gate or
mesh/repo-check, so the old green stood and branch protection would merge
on it while the fresh check ran; rechecked heads did turn red.
mesh-delivery's recheck now asks the forge's holder to set the gate, and
the repository check when the head holds one, to pending ("checking
again: <why>") before it asks the controller; a forge that cannot be told
refuses the recheck whole. The gitea holder takes pending, and only
pending, on the merge check's statuses by hand: no verdict, so issue 293
still holds.
Reading a pull request's mesh/merge-gate and mesh/repo-check meant scraping the controller's journal:
the forge clips each status to 140 characters and nothing returned the verdict whole. mesh-delivery
already keeps the verdict; it now keeps the machine that ran it, the layers' modules and the report,
and its checks verb joins that to the forge's statuses, read through a new gitea_commit_statuses tool
that also says whether the base's protection lets the commit merge.
after: novox/mesh-controller
A pull request's head announced again from the bus's history at
mesh-delivery's first start was proposed with no verdict and nothing
ever asked its check: the controller had taken that announcement long
before, and stalled raised it after an hour for the operator.
A proposed delivery with no verdict and no check asked is now asked
through delivery-check once it has waited past a grace longer than a
check takes; an announcement carrying its head's decided gate status
takes it. The proposed bound runs from the ask, and H2's close may
re-ask once (a table row) before the delivery is the operator's.
One module answers 'did my change go out' for a commit and orders a
cross-repository change: one compiled state table, its state on the bus,
every transition said, noted on the commit and shown on the pull request.
The forge's holder gains the note, view and status tools it asks with, and
says closed pull requests and a merge's head and statuses.