Commit Graph
5 Commits
Author SHA1 Message Date
jochen f4fb0a7461 Name the package each controller-repository image compiles, and say a renamed file under both names (hq ADR 0267, issue 363)
mesh/merge-gate pass: builds build-agent, gitea, route-proxy → ace, g14, novox, shanks; no bus step; every machine composes with the change as it did witho…
mesh/repo-check pass: its merge-check.sh passed, each part in its toolchain: merge-check.sh (go), merge-check-typescript.sh (typescript)
mesh/delivery delivered
Every merge to the controller's repository rebuilt the route proxy and the
build seat's holder, because their builds read that repository whole. Named,
the build seat hands each only its program's build source and the planner
moves each only when that changes. A rename was said under its new name
alone, so a file moved out of a build source changed nothing the planner
could see.
2026-10-10 02:58:31 +02:00
jochen 1178db279e gitea: say which changed directories hold a module at the merge commit (hq issue 278)
The controller read a changed file as shared code unless its directory was a module it holds or
the merge also changed that directory's manifest. A merge touching modules/showcase/index.ts -
the catalogue's reference module, held by no machine - therefore rebuilt all 103 modules built
from this repository on 2026-10-06, 88 of them byte-identical, with the build agent first only
because everything else is built by it.

Whether a directory is a module is a fact of the repository at the commit, so the announcer now
looks it up: every directory above a changed file (never the root) is asked for its module.json
at the merge commit, and the ones that have one go out as module_dirs, with module_dirs_said.
Not said when the file list is cut, past 300 directories, or when the forge cannot be asked;
the controller then keeps its old rule, which rebuilds too much rather than too little.

modules/showcase stays: TestTheShowcaseModuleIsAValidManifest in mesh-controller parses it and
hq to-be 18 and 20 name it as the reference module.
2026-10-06 19:55:17 +02:00
jochen 1fd2914ae1 Say which modules wait for a person's push, and announce the files a merge deleted (hq ADR 0236)
With a gate on the first machine and a rollback after it, a module's build rolls out by
default. The ones kept back say why: the network path a rollback could not cross, the
providers every consumer on a machine drops with, and the stores holding the photos.
A merge's deleted files are announced, so a module whose manifest went is forgotten
rather than asked to build (the public-acme plan failure).
2026-10-06 18:39:13 +02:00
jochen 52b81d524c gitea: a merge poll looks only at repositories that moved, one pass at a time
With the poll the only announcer of a merge, its cost showed: every 30 s it
asked every repository for its pull requests, a pass outlasted the tick, and
passes piled up beside each other — a merge was announced four and a half
minutes late, and two passes at once could each announce it. A pass now asks
only repositories updated since a minute before the last look, and the next
pass starts when this one ends. hq issue 250.
2026-10-05 18:12:11 +02:00
jochen 45507c3d5c gitea: test that a pull request's files are read past the forge's page cap 2026-10-05 17:47:36 +02:00