Commit Graph
9 Commits
Author SHA1 Message Date
jochen 32d55beb47 Say a pull request nobody checks as a delivery held, owned by mesh-delivery (hq issue 347)
mesh/merge-gate pass: builds gitea, mesh-delivery → novox; no bus step; every machine composes with the change as it did without (4 of 4 compose)
mesh/repo-check pass: its merge-check.sh passed, each part in its toolchain: merge-check.sh (go), merge-check-typescript.sh (typescript)
mesh/delivery superseded: a newer delivery to the same trunk took over its walk
The confirmation review asked for the delivery domain's own vocabulary
instead of a provider standing. A gitea health check would need a `tools`
list (turning gitea's tools into seat verbs), a check of another kind
beside it, and would hold the forge's own deliveries at the first-node
gate; so the delivery's owner says it, with the word it already has.

- gitea_open_pulls (gitea): every open pull request from the forge itself,
  with what its base requires and the statuses its head has.
- mesh-delivery asks it every five minutes and keeps its own first-seen
  time per head (the forge's update time moves on every comment). A head
  on a base requiring mesh/merge-gate OR mesh/repo-check (hq requires only
  the second) with neither for ten minutes is a `stalled` line in state
  `unannounced`, which the controller raises as delivery.<id>.stalled (D14);
  H2 has nothing to close. Once announced it is a delivery of its own.
- The gitea-side watcher and its provider standing are gone.
2026-10-09 13:14:36 +02:00
jochen 67bce7e189 Announce a pull request opened after its push, and say one nobody checks (hq issue 347)
mesh/delivery superseded: a newer head of the same pull request
mesh/merge-gate pass: builds gitea → novox; no bus step; every machine composes with the change as it did without (4 of 4 compose)
mesh/repo-check pass: its merge-check.sh passed, each part in its toolchain: merge-check.sh (go), merge-check-typescript.sh (typescript)
The announcer read only the repositories whose update time moved since its
last pass, less a minute. Opening, reopening or retargeting a pull request
does not move a repository's update time, so a pull request opened more
than a minute after its push was never announced, never checked, and
nothing said so (mesh-sdk #14, 2026-10-09).

- Each pass also looks at every repository holding a pull request updated
  since the floor, by the forge's own search; every ten minutes, or when the
  search fails, at every repository.
- Every five minutes the forge is asked for every open pull request; one on
  a base requiring mesh/merge-gate whose head has had none for ten minutes
  is said as the forge failing that pull request's merge check (a provider
  standing, ADR 0224), which the controller keeps as a condition, and is
  recovered when a check arrives or it closes.
- The client refuses a pull request or issue number that is not one before
  asking the forge (a misnamed tool argument sent pulls/NaN).
2026-10-09 12:55:09 +02:00
jochen 73bb597c16 Hold what the tools say to the glossary's retired words (hq ADR 0244)
mesh/merge-gate pass: builds docker, gitea, lab, nftables, slack, systemd → ace, g14, novox, shanks; no bus step; 4 wait(s) for a person; every machine com…
mesh/repo-check pass: its merge-check.sh passed
mesh/delivery delivered
An agent meets the mesh's words most often in tool descriptions, and
nothing compared them with the glossary: several still said "the host"
for the node-engine and the forge's pull request comment was headed
"Change plan", a word retired twice over. retired-words is the copy of
the words the glossary retires for the tools, and checks/words fails the
repository check when any string a module's code can show, or any
manifest description, uses one. Those found are reworded here.
2026-10-07 20:02:09 +02:00
jochen 33857626be Never set warning on the merge check's statuses: the forge blocks a required one
mesh/merge-gate pass: builds gitea → novox; no bus step; every machine composes with the change as it did without (4 of 4 compose)
mesh/repo-check pass: its merge-check.sh passed
mesh/delivery delivered
Branch protection requires mesh/merge-gate (and mesh/repo-check on the core
repositories) with no admin override, and the forge combines warning as a
failure. A note is now a success that says it; a repository without a
merge-check.sh is a success where repo-check is not required and a failure
for a person where it is; the status tool refuses the merge check's contexts.
2026-10-07 13:55:34 +02:00
jochen b6f0bc309b Add mesh-delivery, the owner of deliveries and delivery groups (hq ADR 0239)
mesh/merge-gate fail: a manifest the change touches fails the module check: modules/mesh-delivery/module.json: this manifest cannot be used:
mesh/delivery delivered
mesh/delivery-group group feat/mesh-delivery delivered: every member is delivered
One module answers 'did my change go out' for a commit and orders a
cross-repository change: one compiled state table, its state on the bus,
every transition said, noted on the commit and shown on the pull request.
The forge's holder gains the note, view and status tools it asks with, and
says closed pull requests and a merge's head and statuses.
2026-10-06 23:59:54 +02:00
jochen cc1305a354 gitea: post a pull request's change plan with its verdict (hq ADR 0238)
mesh/merge-gate pass: the merge check passed
mesh/delivery superseded: a newer head of the same pull request
The gate's status says what the change does and how it was judged; a change that builds
something gets its plan as a comment — the tiers, what each machine receives, and what
is not an ordinary send.
2026-10-06 22:50:32 +02:00
jochen dba71a97a8 gitea: tell the controller which files a pull request deletes; say the dependents a merge would build (hq ADR 0238)
The controller asks its planner what a pull request reaches, as if merged: a module whose
manifest the change deletes is one the merge removes, and the plan's dependents are said
on the gate's status beside the modules it moves.
2026-10-06 22:34:53 +02:00
jochen bd7b757dd9 gitea: give the controller what it maps a pull request onto the graph with; set both check statuses; protect a branch by tool (hq ADR 0237)
The controller now decides what a pull request's check runs from the mesh's module
graph, so the announcement carries the changed directories that hold a module at the
head and whether the head has a merge-check.sh. A verdict sets mesh/merge-gate (the
gate, with the modules it judged) and mesh/repo-check (the repository's own tests).
gitea_branch_protection_get/set let the operator's agent make those statuses required.

The catalogue's merge-check.sh leaves the gate to the build seat and keeps its own layer:
every manifest through module check, and the touched Go modules' tests.
2026-10-06 21:56:04 +02:00
jochen 9951718623 Check every pull request before it merges, and show the verdict on it (hq ADR 0237, to-be 45 §9)
The forge's announcer announces each new head of an open pull request as pull.updated, once,
and marks the head pending; the controller asks the build seat to check it against every
machine of the mesh's facts, and says the verdict as checked, which the forge's holder sets as
the head commit's status mesh/merge-gate - an error never as a success - with the check's own
account as a comment when it is not a pass. merge-check.sh is the catalogue's check: every
manifest through the running controller's module check and merge gate, and the Go tests of each
module the change touches, a module whose dependencies cannot be fetched said as not tested.
2026-10-06 21:16:32 +02:00