Commit Graph
3 Commits
Author SHA1 Message Date
jschoubben b3fcf408f2 Make tests that wait for concurrent work wait on the event or a condition with a long deadline (issue 1814)
A test that slept a fixed time and then asserted what a goroutine, process or
watcher did failed under the checker's load. Each now waits for its positive
evidence (a started baseline, a call counted, a state reached) within 30 s, and
the concurrency-limit tests meet at a barrier instead of overlapping by sleep.

Claude-Session: https://claude.ai/code/session_01NcbgfJ9Gum47zkFKWRaovL
2026-11-01 17:24:19 +01:00
mesh-tools 0260ae92f6 Feature 57 (config and provisioning): release the catalogue, the reviewed release branch merged with main, on top of main 2026-10-16 09:42:45 +00:00
jochen 0fa90e5cf2 screen-lock: the lock screen as a module, claiming node-lock-screen and serving lock (hq ADR 0208)
The distribution's i3lock behind a locker that releases xss-lock's sleep lock
once it is up; timeouts and xss-lock from the session's xinitrc slot, ending
with the session; i3lock-color and xscreensaver declared absent; Go tools lock,
idle, inhibit and locked.
2026-10-04 13:15:39 +02:00