Commit Graph
3 Commits
Author SHA1 Message Date
jschoubben 3c6f2dc274 mesh-issues: a learned merge is kept as of now, closed untimed issues get no fix time, the forge read is declared, the sweep rotates its asks (issue 1950)
mesh/delivery merged: source.main moved to novox/mesh-catalog@02597b66d7de
mesh/check checking 3c6f2dc274a9 on 457c60972c59
2026-10-27 01:30:37 +01:00
jochen aed7e0c968 Read the mesh's comment verdicts as approvals, and warn on no fix timed from the log (issue 403, review 69)
mesh/delivery-group group fix/403-fix-time checking: composed check out of date: novox/mesh-controller@7ca5a45ecc5a was judged against trunk ?, the trunk is no…
mesh/merge-gate out of date: judged against trunk 2fe5601397ae, the trunk is now 0863ec2a059d; judged again on a recheck or when it is merged
mesh/repo-check out of date: judged against trunk 2fe5601397ae, the trunk is now 0863ec2a059d; judged again on a recheck or when it is merged
mesh/delivery superseded: a newer head of the same pull request
The forge refuses an approval of one's own pull request, so the independent
reviews are comment reviews opening with "Verdict: approve at <sha>"; read
only APPROVED, the review phase was never measured. A fix whose start was
read back from the log was fixed before fix times were measured: it is kept
and shown, never warned on. A carried value at fixing after one at diagnosing
starts at its worker's active (the move), not its since (the diagnosis).
2026-10-12 16:16:04 +02:00
jochen 43df7ebc5a Measure each fix from the move to fixing to delivered, and say one over its budget (issue 403)
mesh/merge-gate pass: builds mesh-delivery, mesh-issues → novox; no bus step; every machine composes with the change as it did without (4 of 4 compose)
mesh/repo-check pass: its merge-check.sh passed, each part in its toolchain: merge-check.sh (go), merge-check-typescript.sh (typescript)
mesh/delivery-group group fix/403-fix-time ready: every member ready, and composed together they pass
mesh/delivery superseded: a newer head of the same pull request
hq ADR 0313: the operator's five minutes start when an agent moves the issue
to fixing, not at the merge. mesh-delivery says on each transition, and in
checks, when the pull request opened, when it merged and the class of what it
moves. mesh-issues keeps the first move to fixing, the fix time with its four
phases once the last fix is delivered, serves fix-times, and says
issue-tracker.fix.<class>.over-budget on the operator's channel, cleared by the
next fix of that class within budget.
2026-10-12 15:50:12 +02:00