Commit Graph
4 Commits
Author SHA1 Message Date
jschoubben dfe490d9e2 issue-tracker.changes reads each issue's moves over a window from the tracker's own log, so progress since says from what each issue moved, not only where it is
mesh/delivery merged: source.main moved to novox/mesh-catalog@9cdac09ad962
mesh/check being carried to dfe490d9e245 on 9cdac09ad962 | from 25f615456423
2026-10-28 12:33:01 +01:00
jschoubben 4f317201c9 knowledge-base.progress takes since: only what changed in a window, read from the tracker's and mesh-delivery's history, so a five-minute report says what moved (the operator, 2026-10-28) 2026-10-28 12:33:01 +01:00
jschoubben 76e4ec4dc6 mesh-issues and mesh-knowledge: milestones are records of the issue tracker, and progress reads them (ADR 0493 §1 to §4, issue 1781)
mesh/delivery merged: source.main moved to novox/mesh-catalog@5a4ac4991395
mesh/delivery-group group feat/1781-milestone-records merged: every member is merged
mesh/check checking 76e4ec4dc680 on 26908a89506f | novox/mesh-catalog#506 in group feat/1781-milestone-records
mesh-issues keeps each design's milestone in the state milestones (history 5), says milestone-set and
milestone-moved, and serves milestones, milestone-set and milestone-move. An issue's milestone is its own link
of kind milestone, so at most one milestone per issue is checked inside the issue's own write; kind commit
links a fixing commit. The triage links no milestone, pull request or commit. import with milestones=N seeds
a design's table once. mesh-knowledge's progress reads issue-tracker.milestones and its table parse is gone.

Squashed from four commits so the branch history does not carry a compiled bundle that was committed by
mistake (6 MB); the path is now in .gitignore.
2026-10-26 18:42:51 +01:00
jschoubben 8da33e43d4 Knowledge base: progress says how far a design, milestone, issue or record has come (issue 1947)
A lead's five-minute report and 'is design 47 nearing its end' were joined by hand from
the design file, the tracker and the deliveries. One verb now works the state out
(ADR 0424 §1), minimal for every five minutes, detailed for the report's tree.
Milestones are read from the design's table until the tracker's milestone records
(issue 1781) are delivered.
2026-10-26 16:37:54 +01:00