A test that slept a fixed time and then asserted what a goroutine, process or
watcher did failed under the checker's load. Each now waits for its positive
evidence (a started baseline, a call counted, a state reached) within 30 s, and
the concurrency-limit tests meet at a barrier instead of overlapping by sleep.
Claude-Session: https://claude.ai/code/session_01NcbgfJ9Gum47zkFKWRaovL
mesh/delivery-group group feat/judge-once rejected: composed together: the checker's verdict at the members' heads (5c42ba1fb5f3): integration: artifactstoreto…
mesh/check failed: integration: artifactstoretools/cmd/artifa… | 3e08301b27ea on 4b16c193f0fb | judged by the candidate's mesh-build-go at 8dd51540f73a
47 packages carried the marker and were never kept: about 2000 tests per level ran on every check, whatever it
changed. The marker now lists, as paths or globs from the repository's root (? before a path whose absence is read),
what the package's tests read outside it; the digest hashes those files with the package's own non-Go files. A marker
that lists nothing, names an unclean path, or a line that matches nothing keeps today's never-kept digest.
The 46 markers list their reads; checks/deps and checks/trunk lose theirs (their tests read only temporary
directories). Digest form 6.
Quick fix of issue 1936, chosen by the operator 2026-10-26 21:56; the thorough fix (the Go test log's files kept with
each verdict) stays on the issue.
mesh/merge-gate head f3007eb242f8 merged into trunk 6c6d5f681c30 — pass: builds mesh-mail, mesh-mail-web, new: modules/mesh-mail-reader → novox; no bus ste…
mesh/repo-check head f3007eb242f8 merged into trunk 6c6d5f681c30 — pass: its merge-check.sh passed, each part in its toolchain: merge-check.sh (go), merge-…