Symptom. mesh-controller #215 (merged as fbc7bc97) was batched with #217 (8305e4e3). The batch's walk plan-1791681624611167730 was cut done with no tier ("moved nothing the mesh holds: nothing to walk") but still says it awaits mesh-delivery. The delivery stayed published, waiting for "its walk's start", which a done walk never has; no row of the table could end it, and the operator got a stalled alert.
Fix. A published delivery whose walk ended done without ever being let go (endedUnstarted) is settled from that walk's record:
delivered, when the walk carried its own commit and built every module its plan moves;
covered, when the walk carried a later merge for it and built those modules, or when a later merge into the same trunk, delivered with a passing check, sent them everywhere and the forge says it contains this merge (ADR 0270's coverOf, unchanged);
stopped, with why (the walk, the modules it did not build, its note), once the cover test asked everything and found nothing, 20 minutes after the walk ended. That is inside the 30-minute bound of a published delivery, so the delivery stops before stalled lists it.
The walk's record (WalkSeen) now keeps the modules the walk builds (moved, moved_said). A record kept before this change, with tiers but no modules named, is asked for again rather than read as moving nothing. waits no longer says "its walk's start" for such a delivery.
Live. Once this is delivered, novox/mesh-controller@d2e9dc61590f becomes covered by #219 (novox/mesh-controller@ef551fdfb6b2, merged as 0a2e58c0, walk plan-1791686195314774150, which sent build-agent everywhere). gitea_contains says fbc7bc97 is in 0a2e58c0. The stalled condition then clears.
Tests.issue474_test.go replays the night's shape: covered by a later delivered merge; stopped with why when nothing covers it; delivered or covered by its own walk when that walk built its modules. All three failed on main with "published, waiting for its walk's start". table_test.go gains facts for the two new Published rows. go vet ./..., go test -race ./... -count=1 and the words check pass.
Reviewer checklist: the table still keeps one row per (state, event, act); nothing leaves a final state; Held is never stopped by observation; the stop is only taken once coverOf has no forge question left.
Fixes the delivery half of novox/hq issue 474.
**Symptom.** mesh-controller #215 (merged as fbc7bc97) was batched with #217 (8305e4e3). The batch's walk plan-1791681624611167730 was cut done with no tier ("moved nothing the mesh holds: nothing to walk") but still says it awaits mesh-delivery. The delivery stayed `published`, waiting for "its walk's start", which a done walk never has; no row of the table could end it, and the operator got a stalled alert.
**Fix.** A published delivery whose walk ended `done` without ever being let go (`endedUnstarted`) is settled from that walk's record:
- **delivered**, when the walk carried its own commit and built every module its plan moves;
- **covered**, when the walk carried a later merge for it and built those modules, or when a later merge into the same trunk, delivered with a passing check, sent them everywhere and the forge says it contains this merge (ADR 0270's `coverOf`, unchanged);
- **stopped**, with why (the walk, the modules it did not build, its note), once the cover test asked everything and found nothing, 20 minutes after the walk ended. That is inside the 30-minute bound of a published delivery, so the delivery stops before `stalled` lists it.
The walk's record (`WalkSeen`) now keeps the modules the walk builds (`moved`, `moved_said`). A record kept before this change, with tiers but no modules named, is asked for again rather than read as moving nothing. `waits` no longer says "its walk's start" for such a delivery.
**Live.** Once this is delivered, `novox/mesh-controller@d2e9dc61590f` becomes **covered** by #219 (`novox/mesh-controller@ef551fdfb6b2`, merged as 0a2e58c0, walk plan-1791686195314774150, which sent build-agent everywhere). `gitea_contains` says fbc7bc97 is in 0a2e58c0. The stalled condition then clears.
**Tests.** `issue474_test.go` replays the night's shape: covered by a later delivered merge; stopped with why when nothing covers it; delivered or covered by its own walk when that walk built its modules. All three failed on main with "published, waiting for its walk's start". `table_test.go` gains facts for the two new Published rows. `go vet ./...`, `go test -race ./... -count=1` and the words check pass.
Reviewer checklist: the table still keeps one row per (state, event, act); nothing leaves a final state; Held is never stopped by observation; the stop is only taken once `coverOf` has no forge question left.
A batch's walk the controller judged to move nothing is done when it is cut,
and a merge it carried stayed published waiting for a start that cannot come.
Its walk's record now settles it: delivered or covered when that walk built its
modules, covered when a later delivered merge carried them (ADR 0270), and
otherwise stopped with why once the cover test says none did.
Deliverynovox/mesh-catalog@9d0f93bba856 — failed since 2026-10-11T09:52:03Z
Covered: covered after its failure: a later walk that contains it was delivered: plan-1791711936761655786 (novox/mesh-catalog at 83c64dcd into main, done, contains its merge 83c64dcd)
Delivery plan — builds mesh-delivery → novox; no bus step
tier 0: mesh-delivery
novox: receives mesh-delivery
Machines
route-proxy on ace: passed — carried by plan-1791711055874604089
mesh-delivery on novox: passed — healthy 3 times over 2m19s
mesh-delivery on the rest running it: sent
Transitions
2026-10-11 09:38 (new) → proposed (announced): novox/mesh-catalog#208's head announced
2026-10-11 09:40 proposed → checked (checked): the verdict names this commit
2026-10-11 09:40 checked → ready (accepted): the gate passed or warned, and the repository's own check did not fail
2026-10-11 09:51 ready → published (merged): on the trunk its modules follow: merged there, and its walk opened — or nothing for a walk to move
2026-10-11 09:51 published → delivering (go): its walk started: let go by this owner in its group's order, by a person, or on the controller's own path — not a failed walk that carried a later commit for it, after which it waits for a walk of its own commit
2026-10-11 09:52 delivering → failed (failed): its walk failed, carrying its own commit: a gate on a first machine (what it carried put back), a build, a machine
The commit's note under refs/notes/mesh-plan keeps every transition: git log --notes=mesh-plan.
<!-- mesh-delivery:view -->
**Delivery** `novox/mesh-catalog@9d0f93bba856` — **failed** since 2026-10-11T09:52:03Z
**Covered**: covered after its failure: a later walk that contains it was delivered: plan-1791711936761655786 (novox/mesh-catalog at 83c64dcd into main, done, contains its merge 83c64dcd)
**Delivery plan** — builds mesh-delivery → novox; no bus step
- tier 0: mesh-delivery
- novox: receives mesh-delivery
**Machines**
- route-proxy on ace: passed — carried by plan-1791711055874604089
- mesh-delivery on novox: passed — healthy 3 times over 2m19s
- mesh-delivery on the rest running it: sent
**Transitions**
- 2026-10-11 09:38 (new) → proposed (announced): novox/mesh-catalog#208's head announced
- 2026-10-11 09:40 proposed → checked (checked): the verdict names this commit
- 2026-10-11 09:40 checked → ready (accepted): the gate passed or warned, and the repository's own check did not fail
- 2026-10-11 09:51 ready → published (merged): on the trunk its modules follow: merged there, and its walk opened — or nothing for a walk to move
- 2026-10-11 09:51 published → delivering (go): its walk started: let go by this owner in its group's order, by a person, or on the controller's own path — not a failed walk that carried a later commit for it, after which it waits for a walk of its own commit
- 2026-10-11 09:52 delivering → failed (failed): its walk failed, carrying its own commit: a gate on a first machine (what it carried put back), a build, a machine
The commit's note under `refs/notes/mesh-plan` keeps every transition: `git log --notes=mesh-plan`.
mesh/merge-gate: PASS — every machine composes with the change as it did without (4 of 4 compose) (modules: mesh-delivery)
mesh/repo-check: PASS — its merge-check.sh passed, each part in its toolchain: merge-check.sh (go), merge-check-typescript.sh (typescript)
Delivery plan — builds mesh-delivery → novox; no bus step
tier 0: mesh-delivery
novox: receives mesh-delivery
read by no module's build: modules/mesh-delivery/cmd/mesh-delivery/issue474_test.go, modules/mesh-delivery/cmd/mesh-delivery/table_test.go
Run by the build seat on shanks as build-1791711156271337517 (builds --log build-1791711156271337517).
--- the gate: mesh-delivery
mesh-delivery: ok, 1 tool(s), invokes seat:mesh-controller.delivery-plan, seat:mesh-controller.delivery-order, seat:mesh-controller.delivery-check, seat:mesh-controller.deliver, seat:mesh-controller.delivery-stop, seat:mesh-controller.delivery-walks, gitea.gitea_note_append, gitea.gitea_delivery_view, gitea.gitea_commit_status, gitea.gitea_commit_statuses, gitea.gitea_contains, gitea.gitea_open_pulls, keeps state deliveries, groups
long-running resources without health: 0
files asking for a setting without saying whether it is trusted: 0
1 manifest(s) checked. Judged against the seats this binary carries; a claim on one of the mesh's own seats is judged fully at registration, and a seat declared by a module not given here reads as unknown. Identities judged on a 6-character machine name, against the bounds of the providers given here
judging 0 module(s) changed against 4 machine(s), as the snapshot of 2026-10-11T09:30:02Z says they run
composing every machine as the mesh is
the bus's user list leaves out 5 user(s) the mesh has minted no credential for: controller, node.f35, node.idt, node.ygcyr, node.yvbpsm. Each is a user that cannot connect until one is issued
the bus's user list leaves out 5 user(s) the mesh has minted no credential for: controller, node.f35, node.idt, node.ygcyr, node.yvbpsm. Each is a user that cannot connect until one is issued
composing every machine with the change
the bus's user list leaves out 5 user(s) the mesh has minted no credential for: controller, node.f35, node.idt, node.ygcyr, node.yvbpsm. Each is a user that cannot connect until one is issued
the bus's user list leaves out 5 user(s) the mesh has minted no credential for: controller, node.f35, node.idt, node.ygcyr, node.yvbpsm. Each is a user that cannot connect until one is issued
merge gate: PASS — every machine composes with the change as it did without (4 of 4 compose)
judged by controller development build against the facts of 2026-10-11T09:30:02Z
machines:
- a machine (f35): composes
- holds mesh-dns-resolver (idt): composes
- holds git, holds mesh-artifact-store, holds mesh-broker, holds mesh-catalog, holds mesh-delivery, holds mesh-dns-resolver, holds mesh-store, holds mesh-vault, holds npm-package-registry, the control node, the hub (ygcyr): composes
- a machine (yvbpsm): composes
a merge would rebuild 1 module(s) in 1 tier(s): mesh-delivery
notes:
- modules/mesh-delivery/cmd/mesh-delivery/issue474_test.go and modules/mesh-delivery/cmd/mesh-delivery/table_test.go read by no module's build, and rebuild nothing (issue 280)
--- its merge-check.sh (go toolchain)
ok git.novox.be/novox/mesh-catalog/checks/words 0.003s
words: 12 retired words and 70 daemons' lines, none in the 41417 strings of 672 files
ok git.novox.be/novox/mesh-catalog/checks/agenthome 0.012s
agent-home: no archive and no file written into under the agent's home
ok git.novox.be/novox/mesh-catalog/checks/paths 0.006s
paths: no module names another's state on its machine (3 known, listed to go)
long-running resources without health: 69, as kept
testing modules/mesh-delivery
ok mesh-delivery/cmd/mesh-delivery 2.184s
--- its merge-check-typescript.sh (typescript toolchain)
**Merge check** at `084acc04`
- `mesh/merge-gate`: **PASS** — every machine composes with the change as it did without (4 of 4 compose) (modules: mesh-delivery)
- `mesh/repo-check`: **PASS** — its merge-check.sh passed, each part in its toolchain: merge-check.sh (go), merge-check-typescript.sh (typescript)
**Delivery plan** — builds mesh-delivery → novox; no bus step
- tier 0: mesh-delivery
- novox: receives mesh-delivery
- read by no module's build: modules/mesh-delivery/cmd/mesh-delivery/issue474_test.go, modules/mesh-delivery/cmd/mesh-delivery/table_test.go
Run by the build seat on shanks as `build-1791711156271337517` (`builds --log build-1791711156271337517`).
```
--- the gate: mesh-delivery
mesh-delivery: ok, 1 tool(s), invokes seat:mesh-controller.delivery-plan, seat:mesh-controller.delivery-order, seat:mesh-controller.delivery-check, seat:mesh-controller.deliver, seat:mesh-controller.delivery-stop, seat:mesh-controller.delivery-walks, gitea.gitea_note_append, gitea.gitea_delivery_view, gitea.gitea_commit_status, gitea.gitea_commit_statuses, gitea.gitea_contains, gitea.gitea_open_pulls, keeps state deliveries, groups
long-running resources without health: 0
files asking for a setting without saying whether it is trusted: 0
1 manifest(s) checked. Judged against the seats this binary carries; a claim on one of the mesh's own seats is judged fully at registration, and a seat declared by a module not given here reads as unknown. Identities judged on a 6-character machine name, against the bounds of the providers given here
judging 0 module(s) changed against 4 machine(s), as the snapshot of 2026-10-11T09:30:02Z says they run
composing every machine as the mesh is
the bus's user list leaves out 5 user(s) the mesh has minted no credential for: controller, node.f35, node.idt, node.ygcyr, node.yvbpsm. Each is a user that cannot connect until one is issued
the bus's user list leaves out 5 user(s) the mesh has minted no credential for: controller, node.f35, node.idt, node.ygcyr, node.yvbpsm. Each is a user that cannot connect until one is issued
composing every machine with the change
the bus's user list leaves out 5 user(s) the mesh has minted no credential for: controller, node.f35, node.idt, node.ygcyr, node.yvbpsm. Each is a user that cannot connect until one is issued
the bus's user list leaves out 5 user(s) the mesh has minted no credential for: controller, node.f35, node.idt, node.ygcyr, node.yvbpsm. Each is a user that cannot connect until one is issued
merge gate: PASS — every machine composes with the change as it did without (4 of 4 compose)
judged by controller development build against the facts of 2026-10-11T09:30:02Z
machines:
- a machine (f35): composes
- holds mesh-dns-resolver (idt): composes
- holds git, holds mesh-artifact-store, holds mesh-broker, holds mesh-catalog, holds mesh-delivery, holds mesh-dns-resolver, holds mesh-store, holds mesh-vault, holds npm-package-registry, the control node, the hub (ygcyr): composes
- a machine (yvbpsm): composes
a merge would rebuild 1 module(s) in 1 tier(s): mesh-delivery
notes:
- modules/mesh-delivery/cmd/mesh-delivery/issue474_test.go and modules/mesh-delivery/cmd/mesh-delivery/table_test.go read by no module's build, and rebuild nothing (issue 280)
--- its merge-check.sh (go toolchain)
ok git.novox.be/novox/mesh-catalog/checks/words 0.003s
words: 12 retired words and 70 daemons' lines, none in the 41417 strings of 672 files
ok git.novox.be/novox/mesh-catalog/checks/agenthome 0.012s
agent-home: no archive and no file written into under the agent's home
ok git.novox.be/novox/mesh-catalog/checks/paths 0.006s
paths: no module names another's state on its machine (3 known, listed to go)
long-running resources without health: 69, as kept
testing modules/mesh-delivery
ok mesh-delivery/cmd/mesh-delivery 2.184s
--- its merge-check-typescript.sh (typescript toolchain)
```
mesh/delivery covered after its failure: a later walk that contains it was delivered: plan-1791711936761655786 (novox/mesh-catalog at 83c64dcd into main,…
A stop is final, so a later merge whose queued walk would carry the modules
now holds it off; a stopped one stays in stalled until a later delivered merge
carries them. A walk counts only modules it sent, and an old walk record is read
again rather than taken as building nothing.
mesh/merge-gate: PASS — every machine composes with the change as it did without (4 of 4 compose) (modules: mesh-delivery)
mesh/repo-check: PASS — its merge-check.sh passed, each part in its toolchain: merge-check.sh (go), merge-check-typescript.sh (typescript)
Delivery plan — builds mesh-delivery → novox; no bus step
tier 0: mesh-delivery
novox: receives mesh-delivery
read by no module's build: modules/mesh-delivery/cmd/mesh-delivery/issue474_test.go, modules/mesh-delivery/cmd/mesh-delivery/table_test.go
Run by the build seat on ace as build-1791711521307561350 (builds --log build-1791711521307561350).
--- the gate: mesh-delivery
mesh-delivery: ok, 1 tool(s), invokes seat:mesh-controller.delivery-plan, seat:mesh-controller.delivery-order, seat:mesh-controller.delivery-check, seat:mesh-controller.deliver, seat:mesh-controller.delivery-stop, seat:mesh-controller.delivery-walks, gitea.gitea_note_append, gitea.gitea_delivery_view, gitea.gitea_commit_status, gitea.gitea_commit_statuses, gitea.gitea_contains, gitea.gitea_open_pulls, keeps state deliveries, groups
long-running resources without health: 0
files asking for a setting without saying whether it is trusted: 0
1 manifest(s) checked. Judged against the seats this binary carries; a claim on one of the mesh's own seats is judged fully at registration, and a seat declared by a module not given here reads as unknown. Identities judged on a 6-character machine name, against the bounds of the providers given here
judging 0 module(s) changed against 4 machine(s), as the snapshot of 2026-10-11T09:36:21Z says they run
composing every machine as the mesh is
the bus's user list leaves out 5 user(s) the mesh has minted no credential for: controller, node.f35, node.idt, node.ygcyr, node.yvbpsm. Each is a user that cannot connect until one is issued
the bus's user list leaves out 5 user(s) the mesh has minted no credential for: controller, node.f35, node.idt, node.ygcyr, node.yvbpsm. Each is a user that cannot connect until one is issued
composing every machine with the change
the bus's user list leaves out 5 user(s) the mesh has minted no credential for: controller, node.f35, node.idt, node.ygcyr, node.yvbpsm. Each is a user that cannot connect until one is issued
the bus's user list leaves out 5 user(s) the mesh has minted no credential for: controller, node.f35, node.idt, node.ygcyr, node.yvbpsm. Each is a user that cannot connect until one is issued
merge gate: PASS — every machine composes with the change as it did without (4 of 4 compose)
judged by controller development build against the facts of 2026-10-11T09:36:21Z
machines:
- a machine (f35): composes
- holds mesh-dns-resolver (idt): composes
- holds git, holds mesh-artifact-store, holds mesh-broker, holds mesh-catalog, holds mesh-delivery, holds mesh-dns-resolver, holds mesh-store, holds mesh-vault, holds npm-package-registry, the control node, the hub (ygcyr): composes
- a machine (yvbpsm): composes
a merge would rebuild 1 module(s) in 1 tier(s): mesh-delivery
notes:
- modules/mesh-delivery/cmd/mesh-delivery/issue474_test.go and modules/mesh-delivery/cmd/mesh-delivery/table_test.go read by no module's build, and rebuild nothing (issue 280)
--- its merge-check.sh (go toolchain)
ok git.novox.be/novox/mesh-catalog/checks/words 0.003s
words: 12 retired words and 70 daemons' lines, none in the 41431 strings of 672 files
ok git.novox.be/novox/mesh-catalog/checks/agenthome 0.021s
agent-home: no archive and no file written into under the agent's home
ok git.novox.be/novox/mesh-catalog/checks/paths 0.006s
paths: no module names another's state on its machine (3 known, listed to go)
long-running resources without health: 69, as kept
testing modules/mesh-delivery
ok mesh-delivery/cmd/mesh-delivery 1.973s
--- its merge-check-typescript.sh (typescript toolchain)
**Merge check** at `9d0f93bb`
- `mesh/merge-gate`: **PASS** — every machine composes with the change as it did without (4 of 4 compose) (modules: mesh-delivery)
- `mesh/repo-check`: **PASS** — its merge-check.sh passed, each part in its toolchain: merge-check.sh (go), merge-check-typescript.sh (typescript)
**Delivery plan** — builds mesh-delivery → novox; no bus step
- tier 0: mesh-delivery
- novox: receives mesh-delivery
- read by no module's build: modules/mesh-delivery/cmd/mesh-delivery/issue474_test.go, modules/mesh-delivery/cmd/mesh-delivery/table_test.go
Run by the build seat on ace as `build-1791711521307561350` (`builds --log build-1791711521307561350`).
```
--- the gate: mesh-delivery
mesh-delivery: ok, 1 tool(s), invokes seat:mesh-controller.delivery-plan, seat:mesh-controller.delivery-order, seat:mesh-controller.delivery-check, seat:mesh-controller.deliver, seat:mesh-controller.delivery-stop, seat:mesh-controller.delivery-walks, gitea.gitea_note_append, gitea.gitea_delivery_view, gitea.gitea_commit_status, gitea.gitea_commit_statuses, gitea.gitea_contains, gitea.gitea_open_pulls, keeps state deliveries, groups
long-running resources without health: 0
files asking for a setting without saying whether it is trusted: 0
1 manifest(s) checked. Judged against the seats this binary carries; a claim on one of the mesh's own seats is judged fully at registration, and a seat declared by a module not given here reads as unknown. Identities judged on a 6-character machine name, against the bounds of the providers given here
judging 0 module(s) changed against 4 machine(s), as the snapshot of 2026-10-11T09:36:21Z says they run
composing every machine as the mesh is
the bus's user list leaves out 5 user(s) the mesh has minted no credential for: controller, node.f35, node.idt, node.ygcyr, node.yvbpsm. Each is a user that cannot connect until one is issued
the bus's user list leaves out 5 user(s) the mesh has minted no credential for: controller, node.f35, node.idt, node.ygcyr, node.yvbpsm. Each is a user that cannot connect until one is issued
composing every machine with the change
the bus's user list leaves out 5 user(s) the mesh has minted no credential for: controller, node.f35, node.idt, node.ygcyr, node.yvbpsm. Each is a user that cannot connect until one is issued
the bus's user list leaves out 5 user(s) the mesh has minted no credential for: controller, node.f35, node.idt, node.ygcyr, node.yvbpsm. Each is a user that cannot connect until one is issued
merge gate: PASS — every machine composes with the change as it did without (4 of 4 compose)
judged by controller development build against the facts of 2026-10-11T09:36:21Z
machines:
- a machine (f35): composes
- holds mesh-dns-resolver (idt): composes
- holds git, holds mesh-artifact-store, holds mesh-broker, holds mesh-catalog, holds mesh-delivery, holds mesh-dns-resolver, holds mesh-store, holds mesh-vault, holds npm-package-registry, the control node, the hub (ygcyr): composes
- a machine (yvbpsm): composes
a merge would rebuild 1 module(s) in 1 tier(s): mesh-delivery
notes:
- modules/mesh-delivery/cmd/mesh-delivery/issue474_test.go and modules/mesh-delivery/cmd/mesh-delivery/table_test.go read by no module's build, and rebuild nothing (issue 280)
--- its merge-check.sh (go toolchain)
ok git.novox.be/novox/mesh-catalog/checks/words 0.003s
words: 12 retired words and 70 daemons' lines, none in the 41431 strings of 672 files
ok git.novox.be/novox/mesh-catalog/checks/agenthome 0.021s
agent-home: no archive and no file written into under the agent's home
ok git.novox.be/novox/mesh-catalog/checks/paths 0.006s
paths: no module names another's state on its machine (3 known, listed to go)
long-running resources without health: 69, as kept
testing modules/mesh-delivery
ok mesh-delivery/cmd/mesh-delivery 1.973s
--- its merge-check-typescript.sh (typescript toolchain)
```
Blocking a user prevents them from interacting with repositories, such as opening or commenting on pull requests or issues. Learn more about blocking a user.
Fixes the delivery half of novox/hq issue 474.
Symptom. mesh-controller #215 (merged as fbc7bc97) was batched with #217 (8305e4e3). The batch's walk plan-1791681624611167730 was cut done with no tier ("moved nothing the mesh holds: nothing to walk") but still says it awaits mesh-delivery. The delivery stayed
published, waiting for "its walk's start", which a done walk never has; no row of the table could end it, and the operator got a stalled alert.Fix. A published delivery whose walk ended
donewithout ever being let go (endedUnstarted) is settled from that walk's record:coverOf, unchanged);stalledlists it.The walk's record (
WalkSeen) now keeps the modules the walk builds (moved,moved_said). A record kept before this change, with tiers but no modules named, is asked for again rather than read as moving nothing.waitsno longer says "its walk's start" for such a delivery.Live. Once this is delivered,
novox/mesh-controller@d2e9dc61590fbecomes covered by #219 (novox/mesh-controller@ef551fdfb6b2, merged as 0a2e58c0, walk plan-1791686195314774150, which sent build-agent everywhere).gitea_containssays fbc7bc97 is in 0a2e58c0. The stalled condition then clears.Tests.
issue474_test.goreplays the night's shape: covered by a later delivered merge; stopped with why when nothing covers it; delivered or covered by its own walk when that walk built its modules. All three failed on main with "published, waiting for its walk's start".table_test.gogains facts for the two new Published rows.go vet ./...,go test -race ./... -count=1and the words check pass.Reviewer checklist: the table still keeps one row per (state, event, act); nothing leaves a final state; Held is never stopped by observation; the stop is only taken once
coverOfhas no forge question left.Delivery
novox/mesh-catalog@9d0f93bba856— failed since 2026-10-11T09:52:03ZCovered: covered after its failure: a later walk that contains it was delivered: plan-1791711936761655786 (novox/mesh-catalog at
83c64dcdinto main, done, contains its merge83c64dcd)Delivery plan — builds mesh-delivery → novox; no bus step
Machines
Transitions
The commit's note under
refs/notes/mesh-plankeeps every transition:git log --notes=mesh-plan.Merge check at
084acc04mesh/merge-gate: PASS — every machine composes with the change as it did without (4 of 4 compose) (modules: mesh-delivery)mesh/repo-check: PASS — its merge-check.sh passed, each part in its toolchain: merge-check.sh (go), merge-check-typescript.sh (typescript)Delivery plan — builds mesh-delivery → novox; no bus step
Run by the build seat on shanks as
build-1791711156271337517(builds --log build-1791711156271337517).Merge check at
9d0f93bbmesh/merge-gate: PASS — every machine composes with the change as it did without (4 of 4 compose) (modules: mesh-delivery)mesh/repo-check: PASS — its merge-check.sh passed, each part in its toolchain: merge-check.sh (go), merge-check-typescript.sh (typescript)Delivery plan — builds mesh-delivery → novox; no bus step
Run by the build seat on ace as
build-1791711521307561350(builds --log build-1791711521307561350).