The gate of release 6 (issue 1946): its table holds the merge's states only (proposed, ready, rejected, merged, held for a person); the walk, plan and step code, covering, answers, times and the controller port are deleted, and times, what-if, stalled, release, stop and retire-history leave the seat mesh-delivery. The catch-up of merges at start (the gate's earlier fix) is kept. The delivery comment and mesh/delivery drop the plan and machine steps. Three paths a local go build leaves behind are now ignored.
Tries: try-1792879382079279838 passed on d09cbf15.
Delivery group feat/r6 (design 47, milestone R6; ADR 0539, ADR 0540): mesh-sdk, mesh-host, mesh-delivery, mesh-catalog, hq, mesh-controller. One Approve for the group; its delivery is the last delivery plan the controller runs, and after it a merged change reaches each machine through its wants alone.
After the delivery: the operator's signing key is set as mesh-host's operator-signers setting, and acceptance test 18 is read live.
Release-switch: 6
Reviewed-by: reviewer-r6m@shanks at d09cbf1523
Pushed-by: lead-47@shanks
The gate of release 6 (issue 1946): its table holds the merge's states only (proposed, ready, rejected, merged, held for a person); the walk, plan and step code, covering, answers, times and the controller port are deleted, and `times`, `what-if`, `stalled`, `release`, `stop` and `retire-history` leave the seat `mesh-delivery`. The catch-up of merges at start (the gate's earlier fix) is kept. The delivery comment and `mesh/delivery` drop the plan and machine steps. Three paths a local go build leaves behind are now ignored.
Tries: try-1792879382079279838 passed on d09cbf15.
Delivery group feat/r6 (design 47, milestone R6; ADR 0539, ADR 0540): mesh-sdk, mesh-host, mesh-delivery, mesh-catalog, hq, mesh-controller. One Approve for the group; its delivery is the last delivery plan the controller runs, and after it a merged change reaches each machine through its wants alone.
After the delivery: the operator's signing key is set as mesh-host's operator-signers setting, and acceptance test 18 is read live.
Release-switch: 6
Reviewed-by: reviewer-r6m@shanks at d09cbf152317209703c663322b9e0094d7ca43cb
Pushed-by: lead-47@shanks
Release 6 deletes the plans: the walk half of the holder, the controller port, the carry-over of the former module and the verbs times, what-if, release, stop and retire-history go; the table holds proposed, ready, rejected, merged, held and closed; the delivery's status and view name the source revision the merge moved.
restic keeps data (ADR 0233): what it holds is backed up before it moves
grants step: if this changes what the bus's user list says (a new tool, subject or user), novox is sent that list alone, every build there kept, before restic is judged on its first machine
composed together: pass — the checker's verdict at the members' heads (d2bc2f317716)
Transitions
2026-10-24 22:17 (new) → proposed (announced): novox/mesh-catalog#475's head announced
2026-10-24 22:59 proposed → checked (checked): a verdict names this commit and the trunk's head as its trunk commit
2026-10-24 22:59 checked → ready (accepted): the gate passed or warned, and the repository's own check did not fail
2026-10-24 23:19 ready → published (merged): on the trunk its modules follow: merged there, and its walk opened — or nothing for a walk to move
2026-10-24 23:19 published → delivering (go): its walk started: let go by this owner in its group's order, by a person, or on the controller's own path — not a failed walk that carried a later commit for it, after which it waits for a walk of its own commit
The commit's note under refs/notes/mesh-plan keeps every transition: git log --notes=mesh-plan.
<!-- mesh-delivery:view -->
**Delivery** `novox/mesh-catalog@d09cbf152317` — **delivering** since 2026-10-24T23:19:25Z
**Delivery plan** — builds mesh-delivery-gate, mesh-issues, messenger, restic → ace, g14, novox, shanks; no bus step
- tier 0: mesh-delivery-gate, mesh-issues, messenger, restic
- ace: receives restic
- g14: receives restic
- novox: receives mesh-delivery-gate, mesh-issues, messenger, restic
- shanks: receives restic
- restic keeps data (ADR 0233): what it holds is backed up before it moves
- grants step: if this changes what the bus's user list says (a new tool, subject or user), novox is sent that list alone, every build there kept, before restic is judged on its first machine
**Group** `feat/r6`: novox/hq@ba09497092ec, novox/mesh-catalog@d09cbf152317, novox/mesh-controller@9c38aed78905, novox/mesh-delivery@3e863884fda8, novox/mesh-host@81758b24a8e4, novox/mesh-sdk@748c564cdf7c
- composed together: pass — the checker's verdict at the members' heads (d2bc2f317716)
**Transitions**
- 2026-10-24 22:17 (new) → proposed (announced): novox/mesh-catalog#475's head announced
- 2026-10-24 22:59 proposed → checked (checked): a verdict names this commit and the trunk's head as its trunk commit
- 2026-10-24 22:59 checked → ready (accepted): the gate passed or warned, and the repository's own check did not fail
- 2026-10-24 23:19 ready → published (merged): on the trunk its modules follow: merged there, and its walk opened — or nothing for a walk to move
- 2026-10-24 23:19 published → delivering (go): its walk started: let go by this owner in its group's order, by a person, or on the controller's own path — not a failed walk that carried a later commit for it, after which it waits for a walk of its own commit
The commit's note under `refs/notes/mesh-plan` keeps every transition: `git log --notes=mesh-plan`.
Blocking a user prevents them from interacting with repositories, such as opening or commenting on pull requests or issues. Learn more about blocking a user.
The gate of release 6 (issue 1946): its table holds the merge's states only (proposed, ready, rejected, merged, held for a person); the walk, plan and step code, covering, answers, times and the controller port are deleted, and
times,what-if,stalled,release,stopandretire-historyleave the seatmesh-delivery. The catch-up of merges at start (the gate's earlier fix) is kept. The delivery comment andmesh/deliverydrop the plan and machine steps. Three paths a local go build leaves behind are now ignored.Tries: try-1792879382079279838 passed on
d09cbf15.Delivery group feat/r6 (design 47, milestone R6; ADR 0539, ADR 0540): mesh-sdk, mesh-host, mesh-delivery, mesh-catalog, hq, mesh-controller. One Approve for the group; its delivery is the last delivery plan the controller runs, and after it a merged change reaches each machine through its wants alone.
After the delivery: the operator's signing key is set as mesh-host's operator-signers setting, and acceptance test 18 is read live.
Release-switch: 6
Reviewed-by: reviewer-r6m@shanks at
d09cbf1523Pushed-by: lead-47@shanks
Delivery
novox/mesh-catalog@d09cbf152317— delivering since 2026-10-24T23:19:25ZDelivery plan — builds mesh-delivery-gate, mesh-issues, messenger, restic → ace, g14, novox, shanks; no bus step
Group
feat/r6: novox/hq@ba09497092, novox/mesh-catalog@d09cbf1523, novox/mesh-controller@9c38aed789, novox/mesh-delivery@3e863884fd, novox/mesh-host@81758b24a8, novox/mesh-sdk@748c564cdfTransitions
The commit's note under
refs/notes/mesh-plankeeps every transition:git log --notes=mesh-plan.