Build modules: run every package's tests of a level, with a fixture of two failing packages (issue 1921) #488

Merged
mesh-tools merged 1 commits from fix/1921-every-failure-r into main 2026-10-26 10:18:09 +00:00
Member

Group fix/1921-every-failure-r with mesh-sdk and mesh-delivery, one Approve. mesh-build-go and mesh-build-node pin the group's mesh-sdk head 79649c3f, whose RunAsk runs every test step of a level; mesh-build-go gains a two-failing-packages fixture and a test that both failures are named.

Same patch as the reviewed 1968aba6 of 2026-10-25, on today's main; only the pins changed. Try try-1793009322563236912 passed (8m1s); the first try failed on an npm registry download on ace, not on this change.

Reviewed-by: review-1921r@shanks at 15a5fe09b6

Group fix/1921-every-failure-r with mesh-sdk and mesh-delivery, one Approve. mesh-build-go and mesh-build-node pin the group's mesh-sdk head 79649c3f, whose RunAsk runs every test step of a level; mesh-build-go gains a two-failing-packages fixture and a test that both failures are named. Same patch as the reviewed 1968aba6 of 2026-10-25, on today's main; only the pins changed. Try try-1793009322563236912 passed (8m1s); the first try failed on an npm registry download on ace, not on this change. Reviewed-by: review-1921r@shanks at 15a5fe09b62ea71f43a69d9009606d203c53e76d
mesh-tools added 1 commit 2026-10-26 10:17:18 +00:00
mesh-build-go, mesh-build-node: run every package of a check's level after a failure (issue 1921)
mesh/delivery merged: source.main moved to novox/mesh-catalog@c51a46b802d3
mesh/delivery-group group fix/1921-every-failure-r merged: every member is merged
mesh/check checking 15a5fe09b62e on c51a46b802d3 | novox/mesh-catalog#488 in group fix/1921-every-failure-r
15a5fe09b6
Pins mesh-sdk fix/1921-every-failure-r, whose check ask no longer stops a level at its first failing test step. A captured fixture with a failing test in each of two packages proves the build module's test step names both.
Author
Member

Delivery novox/mesh-catalog@15a5fe09b62e — merged since 2026-10-26T10:18:11Z

Source — source.main moved to novox/mesh-catalog@c51a46b802. Whether it reached the machines is mesh-delivery-view's, derived from source.main, the wants and the haves.

Group fix/1921-every-failure-r: novox/mesh-catalog@15a5fe09b6, novox/mesh-delivery@04a56b7aff, novox/mesh-sdk@79649c3fa9

Transitions

  • 2026-10-26 10:17 (new) → proposed (announced): novox/mesh-catalog#488's head announced
  • 2026-10-26 10:17 proposed → ready (accepted): a verdict names this commit and the trunk's head as its trunk commit, the gate passed or warned, and the repository's own check did not fail; or the check gates no merge (check-gates-merge false)
  • 2026-10-26 10:18 ready → merged (merged): on the trunk its modules follow: merged there

The commit's note under refs/notes/mesh-plan keeps every transition of this change up to its merge: git log --notes=mesh-plan.

<!-- mesh-delivery:view --> **Delivery** `novox/mesh-catalog@15a5fe09b62e` — **merged** since 2026-10-26T10:18:11Z **Source** — source.main moved to novox/mesh-catalog@c51a46b802d3. Whether it reached the machines is `mesh-delivery-view`'s, derived from `source.main`, the wants and the haves. **Group** `fix/1921-every-failure-r`: novox/mesh-catalog@15a5fe09b62e, novox/mesh-delivery@04a56b7aff66, novox/mesh-sdk@79649c3fa9f4 **Transitions** - 2026-10-26 10:17 (new) → proposed (announced): novox/mesh-catalog#488's head announced - 2026-10-26 10:17 proposed → ready (accepted): a verdict names this commit and the trunk's head as its trunk commit, the gate passed or warned, and the repository's own check did not fail; or the check gates no merge (check-gates-merge false) - 2026-10-26 10:18 ready → merged (merged): on the trunk its modules follow: merged there The commit's note under `refs/notes/mesh-plan` keeps every transition of this change up to its merge: `git log --notes=mesh-plan`.
mesh-tools merged commit c51a46b802 into main 2026-10-26 10:18:09 +00:00
mesh-tools deleted branch fix/1921-every-failure-r 2026-10-26 10:18:09 +00:00
Sign in to join this conversation.
No Reviewers
1 Participants
Notifications
Due Date
No due date set.
Dependencies

No dependencies set.

Reference: novox/mesh-catalog#488