It asks what it missed on every start and the answer never arrived: the control plane replayed each
build it held as a module's event from a module called "control-plane", which does not exist, so its
own account refused the publish and the graph kept the gap. The control plane now states those under
the seat it holds (novox/hq ADR 0134, mesh-controller #129), so this consumes that too — one handler,
because what a build means for the graph is the same whether the build machine says it as it happens
or the mesh says what it already held.