jschoubben c75d726205 End every goroutine serve starts before serve returns, so no loop outlives its controller (issue 1945)
The try of the on-change mirror failed with every test passed: goroutines a
served test started outlived its serve and met the next test's globals and its
closed stores. Under -race the served tests show it as a race on conditionsFrom
(watchTheMesh writing it while settlingPending, already running, read it), and
a take-in cut by the stop raised fingerprint-not-composed, a kind with no plain
words, which fails the package after its PASS line.

- serve counts every goroutine it and its parts start (serving_group.go) and
  ends and waits for them before anything else is undone: the lease's watch,
  the pending settler, the status summary, the facts, the mirrors and the new
  declared-packages keeper with its two bucket watches, the declaration sweep,
  the read-call counter, the watches' closers, the have watches, the vault move
  on a report, and the watchdogs, doctor, healers and asker under their own
  group.
- The condition store opens before anything that reads conditionsFrom starts;
  askerFrom is an atomic pointer, read from the keeper's goroutines.
- A done key's take-in cut by the stop raises nothing, and fingerprint-not-composed
  has plain words.
2026-10-25 16:30:58 +01:00
jschoubben a4cd5ba375 Compose the declared-packages mirror only when what it composes from changed (issue 1945)
The mirror composed every node in full on the record mirrors' 10 s tick; a
pass takes about 45 s on the control node, so the controller never rested
(130-175 % CPU, issue 1945 note 22). It now passes on a watch of the
compositions' digests and of the assignments, one pass at a time with the
wakes of a pass coalesced into one after it (at least 30 s apart), skips the
composition when the stores' Input digest is unchanged, and keeps a safety
pass every 10 minutes that composes nothing when nothing changed.
2026-10-25 16:30:58 +01:00
jschoubben 485eb44de4 issue 1840/S3: keep each node's declared packages on the bus, so the pacman verbs can say what a node declares 2026-10-22 14:23:58 +02:00
jschoubben 9859923664 Delete the dead table paths, the move, the store's assignments mirror and its tick (issue 1110)
Every method of builds, build requests, rollouts, merges and assignments reads and writes the chain alone: the else branches that read the tables, the movers and MoveChain with their tests, chain_moved reads, ChainReads and the flags that switched a kind, the store's assignments mirror (KeepAssignmentPlans needs none of it: it uses only the AssignmentMirrored type, mirrors.go, and AssignmentValues, provisioning.go) and its tick, the move code of the controller's start, and ForTest's chain_moved row. The listed store tests of the move go with their functions; the tests of the readers, requests, assignments and plans that lived beside them stay in chain_store_test.go. Tests that replayed old data migrations over the build, assignment and pin tables are removed with the tables. The static test that no plan is written but through SavePlansMoving now reads the plan's chain path.
2026-10-18 05:30:19 +02:00
jschoubben b56c1d00a3 The store's mirror of the assignments may not write while they are switching or moved, asked before every write (issue 1093)
mesh/merge-gate waits for its group's composed check
mesh/repo-check head b56c1d00a3ff merged into trunk 54070f5bc32b beside mesh-catalog#357@68e3326d — fail: its merge-check.sh failed: --- FAIL: TestOneReadO…
mesh/delivery-group group feat/chain-on-the-bus rejected: a member's own check failed
mesh/delivery superseded: a newer head of the same pull request
Review round 2. The writer's leave to write is the lease's and AssignmentsMirrorMayWrite, a flag set before the settle of the assignments' switch, kept after the commit and cleared only if the switch fails, so a pass that read its source before the switch lays and purges nothing after it.
2026-10-18 03:38:25 +02:00
jschoubben e16cb4207b Review round 1 of milestone 5: the move settles changed rows under the lock; reports counted by kind; route-proxy at the new SDK; the plan pass never revives an ended assignment; the store's mirror is refused once moved (issues 1090, 1092, 1093)
1090/1092: the move tests pick each report by kind and expect three, all already, on the second run. 1090-1093: under the share lock the switch reads the rows again and writes every key whose value differs from its row (and ends an assignment the store dropped) before recording the kind, so an update the old controller made after the first pass is not lost. 1093: route-proxy is pinned at mesh-sdk f185aedb and vendored; the controller uses only the SDK's asks package. KeepAssignmentPlans decides each key by keepStep, which never makes or revives an assignment. AssignmentsMirrorToWrite refuses once the assignments are moved.
2026-10-18 03:36:05 +02:00
jschoubben 0e4feb0d3a Keep assignments in the assignments bucket and move the rows there at start (issue 1093)
Once chain_moved records the kind, Assign, Unassign and Assigned write and read the keys <node>.<module>, and every join of the store that read assignments is made from the bucket: where a module runs, what is behind, what a machine awaits, a given value due for replacement, taking a module, and whether a module may be forgotten (refused while a standing assignment names it). An unassignment ends the key with a marker and keeps its earlier values, as it removed the row; no ended or pending mark is written yet. The generation rises with each change, and a seat held by an assignment goes with it: the foreign key from seat_holding is dropped by migration 0104 and the controller says both. The provisioner's plan is kept in the values by a pass of the tick that writes that one field by compare-and-set; the assignment-changed event is said from what the bucket holds, whoever wrote it. The start moves the rows with what each machine was last sent, keeping a plan the mirror put in a value.
2026-10-18 03:15:44 +02:00
mesh-tools d984816844 Feature 57 (config and provisioning): release mesh-controller, the reviewed release branch merged with main, on top of main 2026-10-16 08:28:38 +00:00