The mesh runs on the seat's bus alone (novox/hq ADR 0131, design 28 task 5.5). The old
transport's consume loop, build request, tool ask, management API and account scoping are
deleted, and the bus switch with them; the controller connects to the broker seat and to
nothing else. The store-window tests keep their assertions on a bus-less fake, and the tests
that only made sense for the old transport's in-memory holding go with it.
The controller follows the forge's merges (novox/hq 04-ISSUES/131). For each
module recorded as built from that repository and branch it records the move to
the merge commit and builds it — bases first, because a module built before the
module it stands on is built against the old one and reports success, and a base
that fails stops what stands on it. Nothing is pushed here: what a finished build
does to the machines running the module stays the upgrade's decision.
Two more things the same ordering gives: `build --behind` builds bases first, and
`build --on <module>` rebuilds everything that stands on a module — the rebuild a
changed base needs, which "behind" does not see because their sources did not
move.
The outbound half went behind `Bus` and the transport stopped reaching its
callers; this is the other half, and the larger one. Every handler took
`amqp.Delivery`, so the serving loop could not move to another bus without
moving enrolment, reports, builds, upgrades and catch-up with it in one breath.
`Control` states one message in the mesh's words — took it, dropped it, or held
it for the store — and `Inbound` is where messages come from. The AMQP
implementation is today's loop moved rather than changed: same queues, same
prefetch, same holding, because the mesh is running on it and a bus nothing
speaks yet is no reason to alter the one every node is on.
The window (window.go) is now what decides, instead of the conditions that were
inlined in the loop. Two things that surfaced in the wiring:
**Supersession is asked before the store, not after.** A report about a
declaration the mesh has moved past would otherwise wait out a restarting store
to be written and then overwrite what the node is doing now.
**Half of a report is not about a declaration, and that half is never stale.**
What the machine *is* — the tunnel it took over, the ports its own bundle
holds, what an adopted node found, a node moving its overlay key — reaches the
mesh on a report and nowhere else. A rekey set aside as stale is a node whose
overlay key never moves, and no retry is coming, because the node said it once.
So staleness is asked only of a report that is purely an apply's account.
The one thing holding-in-memory can do that holding-in-the-server cannot is
named rather than hidden: `About` sets aside a held message when a newer one
about the same thing arrives, and the bus being built ignores it because the
digest answers the same question.