jochen 12d4025d30 Say a walk's phases out of order unknown, never a negative time (hq issue 382)
mesh/merge-gate pass: builds build-agent, mesh-controller → ace, g14, novox, shanks; no bus step; every machine composes with the change as it did without …
mesh/repo-check pass: its merge-check.sh passed
mesh/delivery delivered
#206's own walk kept its first send 783 ms before its build, and delivery
walks said send-first measured at -783 ms. A moment recorded before the
one before it now makes both phases unknown: the earlier one's time joins
the unknown time, the later one has none, and the walk goes on from the
later moment. Measured phases and unknown time still add up to the total.
2026-10-10 21:15:48 +02:00
jochen 6805e2bcb3 Walk phases: a report past the silent bound never moves a walk's end; keep phases outside the hold on the plans; first-node gate in words (review of #206)
mesh/delivery superseded: a newer head of the same pull request
mesh/merge-gate pass: builds build-agent, mesh-controller, route-proxy → ace, g14, novox, shanks; no bus step; every machine composes with the change as it…
mesh/repo-check fail: its merge-check.sh failed: --- FAIL: TestTheInstallersFirstUserListIsWhatTheControllerWouldCompose (0.71s)
2026-10-10 20:20:07 +02:00
jochen c640341c50 Keep each walk's phases and say a delivery over its budget (hq ADR 0282 slice 1, issue 382)
mesh/delivery superseded: a newer head of the same pull request
mesh/merge-gate pass: builds build-agent, mesh-controller, route-proxy → ace, g14, novox, shanks; no bus step; every machine composes with the change as it…
mesh/repo-check fail: its merge-check.sh failed: --- FAIL: TestTheInstallersFirstUserListIsWhatTheControllerWouldCompose (0.62s)
The operator's budget (a leaf module running everywhere within five minutes
of its merge, a core module within ten) cannot be held to without knowing
where a walk's time goes. A walk now keeps when its batch's window closed,
when it was cut and its class (migration 0093), each gate reading, and what
each machine of the rest was sent; 'delivery walks' and plan-moved say its
phases from the merge to every machine of the rest reporting the build
applied, and ended walks keep them as walk-phase durations per class. Probe
D16 reads mesh-delivery's 'times' and raises delivery.<class>.over-budget.
A phase that cannot be measured is said unknown, never zero. Measurement
only: no walk is held, sent or judged differently.