mesh/merge-gate head 185d0294ebd4 merged into trunk 89abce5df955 — pass: builds build-agent, mesh-controller → ace, g14, novox, shanks; no bus step; the ch…
mesh/delivery covered after its stop: a later merge that contains it was delivered: novox/mesh-controller@0b312218f90f (merged as 791786d5 into main, wal…
mesh/check pass 185d0294ebd4 on 89abce5df955 | unit 1756 run, 0 kept, 4 skipped | integration 3034 run, 0 kept, 16 skipped | over bound: integration (…
The checker's integration store answers on a unix socket named in the query of MESH_TEST_POSTGRES
(?host=<socket dir>&sslmode=disable). The identity, inventory and licences fixtures cut the address at
its last slash and appended ?sslmode=disable, dropping host=, so pgx dialled its default socket where no
server is: every store test waited out its 20 s readiness bound, each package ran into go test's
10-minute timeout, and the verdict named only the first failure,
identity.TestACertificateChainsToTheMeshsOwnAuthority.
store.DatabaseForTest now builds that address for every fixture, keeping the query as the template raise
already did; identity's fresh is ForTest rather than a second copy. The readiness bound and its error,
which wraps the driver's cause, are unchanged.
The controller tells mesh-config what a pull request declares, asks the approved held values with each check, and the build agent and merge gate lay them over the change's composition only: a key the trunk does not declare yet can then be approved before the merge (ADR 0502).
mesh/check failed: unit: i3/cmd/i3-tools.TestTheMainFileAndEveryModulesContributionLoadTogether: manifest_test.go:247: expected the launcher, clipboar…
A bundle is built only from its module's directory (ADR 0480 clause 4), so the proxy leaves
examples/ and the controller's internal/broker; the broker keeps no second copy of what the
proxy shares with mesh-sdk. The image and its Dockerfile go, and a test holds that only
build-agent declares one (clause 11).
mesh/merge-gate head 0e0c775bfa5e merged into trunk f10fbda1f619 — pass: builds build-agent, mesh-controller → ace, g14, novox, shanks; no bus step; every …
mesh/merge-gate head 9f0d9098b735 merged into trunk d163304e3ff1 — pass: builds build-agent, mesh-controller → ace, g14, novox, shanks; no bus step; every …
mesh/merge-gate checking again: its repo-check failed at 12:59 UTC only on TestTheCataloguesDerivedSubjectsMeet, a catalogue fault (mesh-issues' dead subsc…
mesh/repo-check checking again: its repo-check failed at 12:59 UTC only on TestTheCataloguesDerivedSubjectsMeet, a catalogue fault (mesh-issues' dead subsc…
The first pass of the adapter resolved every machine with no settings in the Input, so a provider whose served fact says ${setting:domain} could not be settled and the whole Input failed (the equality try on the live facts). The settings of every module that has any are read first; a module's settings that do not read are an error only for a machine that resolves to it. A recorded module that cannot be kept at the build a machine runs refuses that machine alone, as planFor did, and no longer the whole Input. The bus's refusal (no user has a credential) is carried for the machine that runs the bus.
How each pair credential a node takes stands (held with its sealed consumer copy, the next send makes it, only a person's to give and nobody gave, or refused in the controller's words), the credentials made for each provider's consumers, the own secrets with their origin and key and value, the vault's kept boxes, the bus's users, minted users and memberships, the mesh's authority and each machine's serving key and kept certificate, the repositories built, the current builds and the build of each commit a machine that reads them is sent. A credential no row holds is not made (planFor made it in every mode): the adapter returns it as would-make for perform (issue 1385). New reads in the inventory (OwnSecretRows, PairCredentialState, BusMinted) and the identity (KnownAuthority, KeptCertificate) write nothing.
The three tests of the controller's own module.json (process, claimed seat, addresses), the Dockerfile and Makefile pin test, the build-agent registry test and the manifest-in-use seat test move with their old package, as tests of mesh-sdk's exported API; a moved test is exempt from failing first.
go.mod and go.sum move to mesh-sdk 14fd5cb68fd1, the commit on its main that holds go/catalogue, go/overlay and go/validate (ADR 0453 clause 2); vendor/modules.txt follows in the last of the six commits.
mesh/merge-gate head 3ac8657a49bf merged into trunk 230f0a1a18f2 — pass: builds build-agent, mesh-controller → ace, g14, novox, shanks; no bus step; every …
mesh/merge-gate head 19e3eac74658 merged into trunk 89cfa9431d8f — pass: builds build-agent, mesh-controller → ace, g14, novox, shanks; no bus step; every …
mesh/merge-gate head ac79e29319ee merged into trunk 5939bbdefe5a — pass: group feat/delivery-watch composed: every machine composes with the change as it d…
mesh/merge-gate head a825a4c90446 merged into trunk d3556f452e8c — pass: builds build-agent, mesh-controller → ace, g14, novox, shanks; no bus step; every …
The layout gate is switched on when the stores open (UseChainOpener), before
attachTheChain; a read of the start came first, was refused, and the
controller exited. A read that finds no marker now lays the builds out once,
under a lock, and is refused only when that fails (a process without the
lease).
mesh/merge-gate head 68db18bdfc1b merged into trunk da6d038e07c0 — pass: builds build-agent, mesh-controller → ace, g14, novox, shanks; no bus step; every …
The merge gate raises the snapshot's mesh in a throwaway store and now gives it a chain in memory, since the chain lives only on the bus. A module with no commit is carried by no send (a send is read from the commits on the assignments' keys), so the grants step flags only a module with a commit as newly assigned. The tests that sent a module with no build record one, the merge test waits for the merges' consumer before publishing and for the last look of a window before the next test, the pending test follows a chain that deletes nothing, and a wait's settling is a value of its key.
mesh/merge-gate head cbc6bac8c070 merged into trunk da6d038e07c0 — error: builds build-agent, mesh-controller → ace, g14, novox, shanks; no bus step; the m…
mesh/repo-check head cbc6bac8c070 merged into trunk da6d038e07c0 — fail: its merge-check.sh failed: --- FAIL: TestTheGrantsStepSendsTheUserListAndNothingEl…
The fixtures' fresh chain writes the layout marker, as the controller's start leaves a mesh, so the gate stays for the live start. A pending wait that ended unanswered is carried by the next one, so both are known. A hand send forgets what each assignment runs, so the test writes its build and commit after the send.
The live start recorded its layout in chain_moved, so the marker is missing and the layout runs once more over the old keys. It wrote newest, worked, held, commit and source over the pointers of every build made since. Pointers are now made only where missing, and a record already under its new key is not read again.
Delivery 2 deleted the move and chain_moved, so the layout of the builds under their modules is made by the controller's start (LayBuildsOut), recorded by the key layout.done in the builds bucket, retried every half minute with an urgent condition while it fails; the chain on the bus is refused until it exists. Its source readers use the module and pointer reads.
mesh/merge-gate head c79591531575 merged into trunk aa02e7bf4e78 — pass: builds build-agent, mesh-controller → ace, g14, novox, shanks; no bus step; every …
Milestone 5 moved 8,599 build records onto the bus under bare build ids, each
carrying its module's whole manifest. Every build lookup then read the whole
bucket, and a delivery plan's send did that per module per machine while it
held the plans and the machine's declaration: the send of build-agent never
finished, and every other act and the status waited behind it.
Builds now live under <module>.build.<id> (requests under req.<id>, id.<id>
names a build's module), with pointer keys newest, worked, held,
commit.<sha> and source.<reuse key> that move only to a newer build and are
read as hints, repaired when wrong. Manifests are kept once in the same
bucket under manifest.sha256-<hex>, so no grant the running bus lacks is
needed. The old keys are laid out once at start, idempotently, and left
unread. The calls a plan look makes on the silent clocks while it holds the
plans are bounded, since the vendored kv.Keys ignores its context.
A found ended or pending key is skipped and a pulled-in key is created only where no key exists. RecordSentWith and RecordSentUnder set sent_builds = null in their own update of the node row, so a machine delivery 2 has sent is never copied afterwards. These two updates and the copy's own null are the only writes to the column.
Delivery 1 wrote no commit on the key of a pulled-in module, so after the upgrade those modules fell out of SentBuilds. At the start of the lease holder a copy fills every key that names no commit (creating a standing pulled-in key where none stands), overwrites nothing, empties each column it copied, and raises an urgent condition while it fails. Migration 0105 no longer drops node.sent_builds (issue 1112 does).
The migration raises first unless chain_moved names builds, rollouts and assignments for every kind that holds rows, and unless pending_assignment holds no open or unanswered row; then it drops build_request, build, batched_merge, release_plan, pending_assignment, assignment, raise_assignment_generation(), node.sent_builds and chain_moved. build_gate stays.
Every method of builds, build requests, rollouts, merges and assignments reads and writes the chain alone: the else branches that read the tables, the movers and MoveChain with their tests, chain_moved reads, ChainReads and the flags that switched a kind, the store's assignments mirror (KeepAssignmentPlans needs none of it: it uses only the AssignmentMirrored type, mirrors.go, and AssignmentValues, provisioning.go) and its tick, the move code of the controller's start, and ForTest's chain_moved row. The listed store tests of the move go with their functions; the tests of the readers, requests, assignments and plans that lived beside them stay in chain_store_test.go. Tests that replayed old data migrations over the build, assignment and pin tables are removed with the tables. The static test that no plan is written but through SavePlansMoving now reads the plan's chain path.