The pipeline was observable from a merge to an artifact and went dark where it touched a machine: a
node's report is control traffic only the control plane reads, so nothing said which version a
machine runs, or that it refused to (novox/hq ADR 0134). The control plane now states both under the
seat it holds — a role's events belong to the role and keep their address when the holder is
replaced — and only when the report is news, because a machine reconciles every minute and a fact per
report would be a fact per minute per machine.
Whether a report is news is the store's answer: it holds the previous one, so the listener returns it
and the server states the fact. That also gives the catch-up replay a subject the controller may
publish: it was published as a module's event from a module called "control-plane", which does not
exist, so the controller's own account refused it and every catalogue that asked what it missed was
answered with nothing.
Review of the ADR 0105 build (hq ADR 0105). Four things it got wrong and one
path it lacked:
- A predecessor spoke's tunnel names one peer, the hub, routed the whole
range; recording refused it and the whole enrolment failed. Range-routed
peers are skipped now — only the hub's peers are ever carried.
- The range and the carried peers were conditions on the node being adopted,
so converging the hub would have renumbered the mesh and dropped the peers
still reaching it. They are facts of the tunnel record now, mode aside; the
takeover alone is declared to an adopted node. Converging the hub is refused
while a carried peer has not enrolled, naming it.
- A push composed a takeover for a hub whose address or endpoint disagreed
with the tunnel, which would have the host stop the found interface and
raise the mesh's where no peer listens. The graph refuses to compose it,
naming both and the placement that fixes it.
- The host's account said taken or not; "found down and the mesh's not up"
read as not taken. Three states now, and an account on every takeover.
- A hub that enrolled before this feature holds a key of its own, and
re-enrolling would rotate every key the mesh sealed credentials to. A node
now rekeys in a report, signed with its identity key over the key it
leaves, the key it takes and the tunnel; the mesh verifies against the live
key, refuses a stale or foreign proof, records key and tunnel, and moves a
hub to the tunnel's address. `overlay show` names the path for a hub that
found no tunnel.
Also: a carried IPv6 peer is routed /128, and identity.ForTest exists so the
link can be tested against a real identity store.