mesh/merge-gate pass: builds build-agent, mesh-controller → ace, g14, novox, shanks; no bus step; every machine composes with the change as it did without …
cancel, clear and rebuild kept a walk's end or restart without saying it, as plans stop, retry and
release-backlog did before them. The controller's run now says every save a verb makes on the bus, so the
next verb cannot lose a mark the same way. A stop is cleared when a walk is resumed, so one that fails again
ends failed and the search for its merge runs (review 21, ADR 0308, issue 532).
The router holds what an open walk touches and tells its result once; it can do so
only if plan-moved names the walk's start and end, the modules and machines it moves,
what a moved tool runner or node-engine carries there, and how long to hold.