mesh/merge-gate pass: builds build-agent, mesh-controller, route-proxy → ace, g14, novox, shanks; no bus step; every machine composes with the change as it…
The operator's budget (a leaf module running everywhere within five minutes
of its merge, a core module within ten) cannot be held to without knowing
where a walk's time goes. A walk now keeps when its batch's window closed,
when it was cut and its class (migration 0093), each gate reading, and what
each machine of the rest was sent; 'delivery walks' and plan-moved say its
phases from the merge to every machine of the rest reporting the build
applied, and ended walks keep them as walk-phase durations per class. Probe
D16 reads mesh-delivery's 'times' and raises delivery.<class>.over-budget.
A phase that cannot be measured is said unknown, never zero. Measurement
only: no walk is held, sent or judged differently.
mesh/merge-gate pass: builds build-agent, mesh-controller → ace, g14, novox, shanks; no bus step; every machine composes with the change as it did without …
mesh/merge-gate pass: builds build-agent, mesh-controller → ace, g14, novox, shanks; no bus step; every machine composes with the change as it did without …
Every merge opened a walk and the next merge of the branch superseded it: two
catalogue merges 18 s apart left a walk no delivery held, and the operator
started it by hand 58 minutes later. A merge now joins the open batch, kept in
the store (migration 0089), which is cut into one walk when no merge came for
merge-window (90 s) or at merge-window-at-most (10 min): one commit per
repository, the latest of its branch, with every file the batch's merges
changed. One walk at a time; a started walk is never superseded, a waiting one
is folded into the next. The walk names every merge it answers on the wire
(delivery.merges, taken_over_by, batch). A failed walk walks its earlier merges
alone, newest first, until one is delivered. A delivery group's order becomes
tier edges inside the walk. plans shows the batch assembling; S18 and S19
bound its waits; S16 names the merges a waiting walk answers.
A failed build, or a plan closed before reaching a module, left the
closure its last good build said, and a fix-forward to a newly imported
package would have moved nothing. A missed merge moving only a module
that packages the repository was never caught up, and an older merge
read as history for it through a look that was not its own. The gate,
a pull request's check, the what-if and a delivery's order now read the
same view the merge handler does.
mesh/merge-gate pass: builds build-agent, mesh-controller, route-proxy → ace, g14, novox, shanks; no bus step; every machine composes with the change as it…
The group feat/a-machine-joins-through-the-tunnel was refused: the
controller's member moved the build agent, which builds the node-engine
(built by: controller first), and the node-engine goes before the
controller (engine before controller: engine first). Both rules applied
to one pair in opposite directions, and every two-way pair was a cycle.
Rules now have a precedence (hq ADR 0249): a declared after: line, then
what the graph and the change say (built by, version skew), then the
rollout default engine-before-controller. The higher rule decides the
pair, which says what it won over. Rules of one rank both ways are still
refused, as a contradiction naming both rules and how to declare the
order. TestReplay309 replays the group with only what orderOf had before.
While the mesh-delivery seat has a holder on record, a merge that moves no
core module opens its walk and asks nothing until mesh-delivery or a person
says go; nothing of it is registered before its turn, so no other send
carries it. The controller keeps the planner, the gate, sending and the
walk, and gains the verbs the owner asks with: delivery-plan, -order,
-check (a group composed as one future state), deliver, delivery-stop,
delivery-walks; every walk kept is said as plan-moved.