Assignments and builds live on the bus (ADR 0408), so a fixture written before the chain was attached was not what
the serving controller read; and push, which the row test used, went with the plans.
With no plan left to name a build or a send to keep the plans, a want names what a collection must keep, and the
composition is where the provisioner's plans are composed for the assignments mirror (ADR 0539 clauses 1 and 5);
the assignments no longer name a node's build, so the controller replaced is the newest earlier build of it.
chainBuildByID answered a trimmed build without SourceFingerprint since builds moved to the builds bucket (issue 1090), so
currentFingerprints read every fingerprint empty and grantsFrom skipped every module: mesh-controller_grants has never held
a key, and TestTheGrantOfAnIssuedCredentialIsOnTheBus failed on main.
A sweep read what it keeps before what was ever recorded, so a take-in's
build recorded between the two reads, by a concurrent take-in off the
plans' hold, was eligible and let go of seconds after the take-in read
it; a new module's build is unkept until it is registered. Now the sweep
reads the records first and keeps what a build recorded within the hour
or an open plan names, and names every reference it lets go of; a take-in
holds every artifact in the store before recording, failing on one the
store lacks; and RecordBuild clears artifact_collected as RecordMirrored
does.
mesh/merge-gate head 185d0294ebd4 merged into trunk 89abce5df955 — pass: builds build-agent, mesh-controller → ace, g14, novox, shanks; no bus step; the ch…
mesh/delivery covered after its stop: a later merge that contains it was delivered: novox/mesh-controller@0b312218f90f (merged as 791786d5 into main, wal…
mesh/check pass 185d0294ebd4 on 89abce5df955 | unit 1756 run, 0 kept, 4 skipped | integration 3034 run, 0 kept, 16 skipped | over bound: integration (…
The checker's integration store answers on a unix socket named in the query of MESH_TEST_POSTGRES
(?host=<socket dir>&sslmode=disable). The identity, inventory and licences fixtures cut the address at
its last slash and appended ?sslmode=disable, dropping host=, so pgx dialled its default socket where no
server is: every store test waited out its 20 s readiness bound, each package ran into go test's
10-minute timeout, and the verdict named only the first failure,
identity.TestACertificateChainsToTheMeshsOwnAuthority.
store.DatabaseForTest now builds that address for every fixture, keeping the query as the template raise
already did; identity's fresh is ForTest rather than a second copy. The readiness bound and its error,
which wraps the driver's cause, are unchanged.
R4e, resumed at tier 1 after a stop of five hours, named ace and shanks silent within seconds of tier 1's send: the
walk judged each machine on every send it had made it, tier 0's of 00:23 too, held against tier 1's templates, and
measured the bound from it. A send carries the whole declaration, so the last one is what a machine is judged on.
The resume kept the tier's entry of before the stop, so the plan read waiting for 5h48m. And plans retry refused a
walk failed only by the gate's silence, though its machines had since applied.
The controller tells mesh-config what a pull request declares, asks the approved held values with each check, and the build agent and merge gate lay them over the change's composition only: a key the trunk does not declare yet can then be approved before the merge (ADR 0502).
mesh/check failed: unit: i3/cmd/i3-tools.TestTheMainFileAndEveryModulesContributionLoadTogether: manifest_test.go:247: expected the launcher, clipboar…
A bundle is built only from its module's directory (ADR 0480 clause 4), so the proxy leaves
examples/ and the controller's internal/broker; the broker keeps no second copy of what the
proxy shares with mesh-sdk. The image and its Dockerfile go, and a test holds that only
build-agent declares one (clause 11).
mesh/merge-gate head 0e0c775bfa5e merged into trunk f10fbda1f619 — pass: builds build-agent, mesh-controller → ace, g14, novox, shanks; no bus step; every …
mesh/merge-gate head 9f0d9098b735 merged into trunk d163304e3ff1 — pass: builds build-agent, mesh-controller → ace, g14, novox, shanks; no bus step; every …
mesh/merge-gate checking again: its repo-check failed at 12:59 UTC only on TestTheCataloguesDerivedSubjectsMeet, a catalogue fault (mesh-issues' dead subsc…
mesh/repo-check checking again: its repo-check failed at 12:59 UTC only on TestTheCataloguesDerivedSubjectsMeet, a catalogue fault (mesh-issues' dead subsc…
The first pass of the adapter resolved every machine with no settings in the Input, so a provider whose served fact says ${setting:domain} could not be settled and the whole Input failed (the equality try on the live facts). The settings of every module that has any are read first; a module's settings that do not read are an error only for a machine that resolves to it. A recorded module that cannot be kept at the build a machine runs refuses that machine alone, as planFor did, and no longer the whole Input. The bus's refusal (no user has a credential) is carried for the machine that runs the bus.
How each pair credential a node takes stands (held with its sealed consumer copy, the next send makes it, only a person's to give and nobody gave, or refused in the controller's words), the credentials made for each provider's consumers, the own secrets with their origin and key and value, the vault's kept boxes, the bus's users, minted users and memberships, the mesh's authority and each machine's serving key and kept certificate, the repositories built, the current builds and the build of each commit a machine that reads them is sent. A credential no row holds is not made (planFor made it in every mode): the adapter returns it as would-make for perform (issue 1385). New reads in the inventory (OwnSecretRows, PairCredentialState, BusMinted) and the identity (KnownAuthority, KeptCertificate) write nothing.
The three tests of the controller's own module.json (process, claimed seat, addresses), the Dockerfile and Makefile pin test, the build-agent registry test and the manifest-in-use seat test move with their old package, as tests of mesh-sdk's exported API; a moved test is exempt from failing first.
go.mod and go.sum move to mesh-sdk 14fd5cb68fd1, the commit on its main that holds go/catalogue, go/overlay and go/validate (ADR 0453 clause 2); vendor/modules.txt follows in the last of the six commits.
mesh/merge-gate head 3ac8657a49bf merged into trunk 230f0a1a18f2 — pass: builds build-agent, mesh-controller → ace, g14, novox, shanks; no bus step; every …
mesh/merge-gate head 19e3eac74658 merged into trunk 89cfa9431d8f — pass: builds build-agent, mesh-controller → ace, g14, novox, shanks; no bus step; every …
mesh/merge-gate head ac79e29319ee merged into trunk 5939bbdefe5a — pass: group feat/delivery-watch composed: every machine composes with the change as it d…