jschoubben e419d0182f Delete the builder, the build asks, the build queue and the merge gate: the builder's keys are the only way a module is built (issues 1851, 1299, 1318; C2b-C5, C10)
The controller asks no build of anybody (ADR 0501 §5, ADR 0525 clause 6, ADR 0503 §3). Every module of a walk is taken from the
builder's done key; a key not done yet waits, named in the plan, and never fails it.

- C2b/C2c: internal/builder and cmd/mesh-controller's asks go (askABuild, onlyTheBuildersOwn, buildOneAsked, takeIn from an
  outcome, buildAgentsOwn, the builder's say and its fallback, the daemon hearing an outcome). The server follows the retired
  seats' built subjects only to let go of them, because the installer's carried user list names them.
- C2d: replay, queue, cancel, clear, kill, pause, resume, delivery-check, check-here and merge-gate are refused by name.
- C3: the check queues (CHECKS_READY, CHECKS_OTHER) and their workers, the checks-running and plans-building buckets and
  their grants, the build queue and its hold (plans_building.go, queue.go, link/holds.go, builds_nats.go, checks_nats.go).
- C4: merge_gate*.go, the pull request's repo-check path, the Checked event and its layers; a pull request asks the
  controller nothing but to tell mesh-config what its head declares.
- C5: the builds bucket is written only by key_takein.
- C10 (help and refusals): the terminal's help lists only what is served.

Integration tests of the plan's tiers, sends, stops and retries now run on a stand-in builder with a done key for every
module (walk_keys_scaffold_integration_test.go); the tests of the asks, the queue, the merge gate and the replays are deleted.
2026-10-23 15:55:15 +02:00
jschoubben 791c2a3d48 Refuse a removed verb by name before reading its arguments, as the SDK member's table now offers none (issue 1851, A11a; issue 1318, C3) 2026-10-22 19:05:05 +02:00
jschoubben 45d091778c Refuse delivery-plan and forget-checks by name and take a merge's warrant from the teller alone, no longer mesh-delivery's (issue 1318, C3, ADR 0450 §8) 2026-10-22 19:05:04 +02:00
mesh-tools 013dad4688 Take the catalogue, overlay and validator from mesh-sdk in cmd/mesh-builder and cmd/mesh-controller, a to g (issue 1381, 1 of 6 import swaps)
Swaps three import paths for mesh-sdk's go/catalogue, go/overlay and go/validate (the same packages, copied from this repository at 6c2a8d62) and lets gofmt order the groups. The six swap commits compile together once the pin commit (go.mod, modules.txt) is on the branch; each alone does not, because a file on the SDK's types cannot call one still on the old package.
2026-10-20 08:22:07 +00:00
jschoubben 66dc501fc4 Split the unit level from the integration level in cmd, builder, link, catalogue, inventory; cheap fixtures for the archive-entry bound, the registry waits and the catalogue copy (issue 895) 2026-10-17 21:32:23 +02:00
jschoubben e43d52c1ea Draw a plan's order per module from the graph and the manifests' change, and read no after: line (issue 977, part B, ADR 0419) 2026-10-17 20:57:30 +02:00
jochen 96fc4209d3 Assemble merges in a rolling window and walk each batch once (hq ADR 0276, issue 362)
mesh/merge-gate pass: builds build-agent, mesh-controller → ace, g14, novox, shanks; no bus step; every machine composes with the change as it did without …
mesh/repo-check pass: its merge-check.sh passed
mesh/delivery superseded: a newer head of the same pull request
Every merge opened a walk and the next merge of the branch superseded it: two
catalogue merges 18 s apart left a walk no delivery held, and the operator
started it by hand 58 minutes later. A merge now joins the open batch, kept in
the store (migration 0089), which is cut into one walk when no merge came for
merge-window (90 s) or at merge-window-at-most (10 min): one commit per
repository, the latest of its branch, with every file the batch's merges
changed. One walk at a time; a started walk is never superseded, a waiting one
is folded into the next. The walk names every merge it answers on the wire
(delivery.merges, taken_over_by, batch). A failed walk walks its earlier merges
alone, newest first, until one is delivered. A delivery group's order becomes
tier edges inside the walk. plans shows the batch assembling; S18 and S19
bound its waits; S16 names the merges a waiting walk answers.
2026-10-10 13:20:04 +02:00
jochen c5a2edf04a Resolve a group's order rules by precedence, not as a cycle (hq issue 309)
mesh/delivery delivered
mesh/merge-gate pass: builds build-agent, mesh-controller, route-proxy → ace, g14, novox, shanks; no bus step; every machine composes with the change as it…
mesh/repo-check pass: its merge-check.sh passed
The group feat/a-machine-joins-through-the-tunnel was refused: the
controller's member moved the build agent, which builds the node-engine
(built by: controller first), and the node-engine goes before the
controller (engine before controller: engine first). Both rules applied
to one pair in opposite directions, and every two-way pair was a cycle.

Rules now have a precedence (hq ADR 0249): a declared after: line, then
what the graph and the change say (built by, version skew), then the
rollout default engine-before-controller. The higher rule decides the
pair, which says what it won over. Rules of one rank both ways are still
refused, as a contradiction naming both rules and how to declare the
order. TestReplay309 replays the group with only what orderOf had before.
2026-10-08 10:43:42 +02:00
jochen 487aa040de Let a walk wait for its delivery's word, and serve the delivery's owner (hq ADR 0239)
mesh/merge-gate pass: every machine composes with the change as it did without (0 of 4 compose)
mesh/delivery delivered
mesh/delivery-group group feat/mesh-delivery merged: every member is merged
While the mesh-delivery seat has a holder on record, a merge that moves no
core module opens its walk and asks nothing until mesh-delivery or a person
says go; nothing of it is registered before its turn, so no other send
carries it. The controller keeps the planner, the gate, sending and the
walk, and gains the verbs the owner asks with: delivery-plan, -order,
-check (a group composed as one future state), deliver, delivery-stop,
delivery-walks; every walk kept is said as plan-moved.