jschoubben 3ca1f5d26a A plan sends what it waits for
A tier whose module a later tier is built by waited for the machines running it to report after the
build — and relied on the catalogue's moved event to send them. A rebuild from the same source commit is
not a move the catalogue announces: the build machine rebuilt for a controller change kept its commit,
nothing sent it, and the plan waited on a report that would never come (2026-10-01, 19:45Z). The plan
now sends the machines running a gated module once, records when, and waits for the reports after that.
2026-10-01 21:54:40 +02:00
jschoubben a69a832248 A merge produces a tiered plan the mesh keeps (hq ADR 0162)
A module's dependencies are one relation in the catalogue — stands-on, packages, built-by, declared —
answered by one call. A merge takes what moved and everything reachable from it, sorts the set into
tiers (a code dependency in the same tier, a build dependency after its base is built, a runtime
dependency after the build machine is built and running; the build machine's own base comes first,
built by the one that runs), writes the plan to the store, asks the first tier and returns. Every
outcome advances the plan; a ticker advances what outcomes cannot; a controller replaced mid-plan
resumes it. status lists open plans and names one that has waited too long.
2026-10-01 17:53:55 +02:00