mesh/delivery covered: a later merge that contains it was delivered: novox/mesh-controller@01f615aa0ad6 (merged as 8f2d22db into main, walk plan-17926707…
mesh/merge-gate head f501eaca4305 merged into trunk 4463991e0609 — pass: builds build-agent, mesh-controller → ace, g14, novox, shanks; no bus step; every …
The registry push tags the image a second time, so removing only the build tag freed nothing.
The held image a comparison pulls goes after it is read, and a node under the floor leaves the ask
to another build node instead of taking it and failing.
A full / made every check on shanks end 'store never became ready' with the reason erased by --rm.
Builds now remove their local image tag, narrowed source and context clone; a build or check
refuses under 20 GiB free on / and the workspace, saying so; the throwaway store is no longer
started with --rm and a store that does not come up reports its exit code and last 20 log lines.