Commit Graph
3 Commits
Author SHA1 Message Date
mesh-tools 3208aa0461 Take the catalogue, overlay and validator from mesh-sdk in cmd/mesh-controller, p to s (issue 1381, 3 of 6 import swaps) 2026-10-20 08:24:43 +00:00
jschoubben 66dc501fc4 Split the unit level from the integration level in cmd, builder, link, catalogue, inventory; cheap fixtures for the archive-entry bound, the registry waits and the catalogue copy (issue 895) 2026-10-17 21:32:23 +02:00
jochen 95556b8def Add the replay of issue 239: a module's name is not taken over by a build from another repository
mesh/merge-gate head 95556b8def3f merged into trunk 8f1aec0832b1 — pass: the change touches no module of the mesh's graph
mesh/repo-check head 95556b8def3f merged into trunk 8f1aec0832b1 — pass: its merge-check.sh passed
mesh/delivery delivered
mesh/delivery-group group fix/239-replay delivered: every member is delivered
The fix (#174, hq ADR 0266 §7) refuses an outcome built from a repository other than the module's
registered one; nothing replayed the photo app's outage that showed why. The replay uses only what
the controller had before the fix, so the prover can show it fails there and passes on the fix.
2026-10-13 07:02:05 +02:00