mesh/merge-gate error: the check could not run: a throwaway postgres:17-alpine could not be raised: docker run --label mesh.build=build-1791318263948250337…
A build that reported applied was sent everywhere; one that then did nothing, served
no tools or broke its machine's word reached every machine. Now the first machine is
judged by the component's health (the core's definitions, as doctor probes H-*, or a
module's own) three times over two minutes within ten; a failing gate puts the previous
build back there once, marks the build, and says it as a condition and an event.
Upgrades roll out by default; the bus is a planned step; a module deleted at its
source is not built (the public-acme plan failure).
Two controllers could both act (issue 204), a reconcile's report could
overtake the apply after it and the digest decided (issue 267), and a grant
could make a second writer of a machine's report.
- The lease (internal/lease, ADR 0229): mesh-controller_lease key `holder`,
15 s age, renewed every 5 s by compare-and-set; the epoch is the revision
it was taken at. The gate is the clock (stops 3 s before expiry); a refused
renewal is a loss and the process exits; a holder that stops gives it back.
serve takes it before asserting the bus. Epochs kept in the store
(migration 0068 controller_epoch) as a floor: a bucket raised from nothing
is compacted past it. Unleased (no epoch, S12 urgent) only when nobody
holds it and the bus will not let it be written. A shell command acts
under the holder's epoch, or its own lease when none.
- Declarations carry `epoch` inside the signed envelope, only to a machine
whose latest account carried a report_sequence (mesh-host #35); would-send
is composed with the epoch last sent. Allot and the send both pass the gate.
- Reports: contract in internal/link/order.go (epoch, sequence,
report_sequence, older_than, refused_older). Accounts kept by epoch, then
sequence, then report sequence; older refused, counted; unordered reports
keep the digest rule. Plans by compare-and-set on a revision, with epoch.
Conditions and calls carry the epoch and are not written off the lease.
- S12 and S13 (naming the writer by epoch) watched, D5 run; reset of the
bucket said. Writers table compiled in and enforced in PermissionsFor; the
controller no longer publishes mesh.control.>. A contract per consumed
kind, and the empty-on-error lint over the repository.
- mesh-host pinned to its main with the epoch in the validator (D1 validates
the envelope as sent).
Needs mesh-host's genesis lock with the lease grant (mesh-host PR) for
TestTheInstallersFirstUserListIsWhatTheControllerWouldCompose.
A registered replay asked now outranked newer asks of its module, and a plan
took any later outcome as its answer. A replay is now refused while the module
is asked anywhere, a plan module asked under an id is answered by that id
alone, and a rebuild of a commit asks what the module follows. An ask handed
back after a restart no longer reads as dead; a cancel that meets a start is
withdrawn; pause holds for an ask fetched as it lands; kill removes containers
before and after the build ends and says whether its outcome went out; a
holder may say only its own machine is paused.
The holder's verbs were served and found by nothing; it now answers discovery
with its machine's four, as a runtime announces a seat's verb, so the console
finds <node>/node-build-agent.kill. A cancel publishes no outcome, so a build
waited for also looks at the cancelled set. A plan that stopped at its first
machine is retried by sending that machine the module again, unless a newer
plan holds it.
Nothing showed what waited for a build machine, and an ask could not be
dropped without leaving the plan that made it waiting for ever. New verbs:
queue, cancel, clear, rebuild, replay, kill, pause, resume, and plans retry.
Every ask a person drops is recorded failed through the same take-in as a
failed build; a plan keeps the id it asked each module under and matches
its outcome by it. replay is a dry run unless registered, and registering
an older commit than one registered since needs --older (hq issue 207).
A plan waiting on a seat paused on every holder says so and is not late;
a failed plan can be retried, and a rebuild joins the plan holding the
module instead of running beside it.