mesh/merge-gate pass: builds build-agent, mesh-controller, route-proxy → ace, g14, novox, shanks; no bus step; every machine composes with the change as it…
mesh/delivery covered: a later merge that contains it was delivered: novox/mesh-controller@4291fee68e95 (merged as a5a132ac into main, walk plan-17913907…
A module could say nothing about what ready means for what it runs, so a web
application with its port open and its requests hanging passed everything for
eleven hours (issue 145). A long-running resource now carries `health` — the
image's own check adopted by name, http, tcp, exec, unit or a module's own tool,
with its timing — refused near its author when it names a port or an address,
an endpoint the module does not declare, a tool it does not serve, a tool check
alone, or a timing outside the record's bounds. It is composed with the endpoint
as the port this machine published it on, and sent only to a node-engine whose
statement says it reads it: an older one would refuse the whole declaration.
The engine is granted its own machine's instance of each health tool. `module
check` warns of every long-running resource without `health`, counts them for
the catalogue, and refuses them from 2026-11-18. A check's findings stay out of
a condition's summary. The node-engine's validator is vendored at its Phase B
commit, so what is composed is judged by the words the engine takes.
Two controllers could both act (issue 204), a reconcile's report could
overtake the apply after it and the digest decided (issue 267), and a grant
could make a second writer of a machine's report.
- The lease (internal/lease, ADR 0229): mesh-controller_lease key `holder`,
15 s age, renewed every 5 s by compare-and-set; the epoch is the revision
it was taken at. The gate is the clock (stops 3 s before expiry); a refused
renewal is a loss and the process exits; a holder that stops gives it back.
serve takes it before asserting the bus. Epochs kept in the store
(migration 0068 controller_epoch) as a floor: a bucket raised from nothing
is compacted past it. Unleased (no epoch, S12 urgent) only when nobody
holds it and the bus will not let it be written. A shell command acts
under the holder's epoch, or its own lease when none.
- Declarations carry `epoch` inside the signed envelope, only to a machine
whose latest account carried a report_sequence (mesh-host #35); would-send
is composed with the epoch last sent. Allot and the send both pass the gate.
- Reports: contract in internal/link/order.go (epoch, sequence,
report_sequence, older_than, refused_older). Accounts kept by epoch, then
sequence, then report sequence; older refused, counted; unordered reports
keep the digest rule. Plans by compare-and-set on a revision, with epoch.
Conditions and calls carry the epoch and are not written off the lease.
- S12 and S13 (naming the writer by epoch) watched, D5 run; reset of the
bucket said. Writers table compiled in and enforced in PermissionsFor; the
controller no longer publishes mesh.control.>. A contract per consumed
kind, and the empty-on-error lint over the repository.
- mesh-host pinned to its main with the epoch in the validator (D1 validates
the envelope as sent).
Needs mesh-host's genesis lock with the lease grant (mesh-host PR) for
TestTheInstallersFirstUserListIsWhatTheControllerWouldCompose.
The controller imports mesh-host/validate through a replace onto the forge
that holds it, and every build — the build agent's go build in a fresh
toolchain container, the Dockerfile's go mod download — would have fetched
it through the public proxy and checksum database at build time: a merge
breaking main on the network, the class Phase 1 removes. vendor/ is
committed; go builds from it with nothing fetched, and refuses to build
when it and go.mod disagree, so a pin moved without go mod vendor fails at
once. The Dockerfile copies vendor/ and builds with GOPROXY=off.