Commit Graph
2 Commits
Author SHA1 Message Date
mesh-tools bfe7fe1530 Pin mesh-sdk at 14fd5cb6 (R4a's merge) and take the catalogue, overlay and validator from it, s to inventory (issue 1381, 4 of 6 import swaps)
go.mod and go.sum move to mesh-sdk 14fd5cb68fd1, the commit on its main that holds go/catalogue, go/overlay and go/validate (ADR 0453 clause 2); vendor/modules.txt follows in the last of the six commits.
2026-10-20 08:26:01 +00:00
jschoubben 32bd8b5d5f Leave a module out of a walk when its check built it the same as what runs (hq issue 721)
mesh/merge-gate head 32bd8b5d5fb2 merged into trunk c2ec0a601acb — pass: builds build-agent, mesh-controller → ace, g14, novox, shanks; no bus step; every …
mesh/repo-check head 32bd8b5d5fb2 merged into trunk c2ec0a601acb — fail: its merge-check.sh failed: --- FAIL: TestNoReaderAnswersEmptyForAnError (2.20s)
mesh/delivery-group group fix/a-module-moves-only-when-its-program-changes rejected: a member's own check failed
mesh/delivery superseded: a newer head of the same pull request
A one-sentence change in a package mesh-builder imports but never reaches moved
build-agent. A merge check now compares each module it builds with the build the
mesh holds, the whole image without file times, labels or creation time, and a
walk is cut without a module every check of its pull requests found the same,
while the mesh still holds that build. A comparison that fails moves the module
as before.
2026-10-14 21:07:25 +02:00