Commit Graph
8 Commits
Author SHA1 Message Date
jschoubben e419d0182f Delete the builder, the build asks, the build queue and the merge gate: the builder's keys are the only way a module is built (issues 1851, 1299, 1318; C2b-C5, C10)
The controller asks no build of anybody (ADR 0501 §5, ADR 0525 clause 6, ADR 0503 §3). Every module of a walk is taken from the
builder's done key; a key not done yet waits, named in the plan, and never fails it.

- C2b/C2c: internal/builder and cmd/mesh-controller's asks go (askABuild, onlyTheBuildersOwn, buildOneAsked, takeIn from an
  outcome, buildAgentsOwn, the builder's say and its fallback, the daemon hearing an outcome). The server follows the retired
  seats' built subjects only to let go of them, because the installer's carried user list names them.
- C2d: replay, queue, cancel, clear, kill, pause, resume, delivery-check, check-here and merge-gate are refused by name.
- C3: the check queues (CHECKS_READY, CHECKS_OTHER) and their workers, the checks-running and plans-building buckets and
  their grants, the build queue and its hold (plans_building.go, queue.go, link/holds.go, builds_nats.go, checks_nats.go).
- C4: merge_gate*.go, the pull request's repo-check path, the Checked event and its layers; a pull request asks the
  controller nothing but to tell mesh-config what its head declares.
- C5: the builds bucket is written only by key_takein.
- C10 (help and refusals): the terminal's help lists only what is served.

Integration tests of the plan's tiers, sends, stops and retries now run on a stand-in builder with a done key for every
module (walk_keys_scaffold_integration_test.go); the tests of the asks, the queue, the merge gate and the replays are deleted.
2026-10-23 15:55:15 +02:00
jschoubben 19e3eac746 The controller no longer subscribes to the alive message: HostBeats, its handler, the heartbeat-gap duration and a fixed silent bound (issue 1183, AC3, AC4, AC5)
mesh/merge-gate head 19e3eac74658 merged into trunk 89cfa9431d8f — pass: builds build-agent, mesh-controller → ace, g14, novox, shanks; no bus step; every …
mesh/repo-check head 19e3eac74658 merged into trunk 89cfa9431d8f — pass: its merge-check.sh passed
mesh/delivery delivered
2026-10-19 02:16:21 +02:00
jschoubben 81715273d3 issue 1025: the operator's Approve of a reviewed group registers a moved module from its new repository (ADR 0420 §7) 2026-10-17 15:56:49 +02:00
jochen 8de4dc7951 Ask the operator for a condition's answers and act on the warrant, so release, stop, start and restart can be answered from any channel that proves who answered (hq ADR 0259) 2026-10-09 16:22:34 +02:00
jochen 1cc6a2d759 Keep what each machine says of what it runs, raise it, and gate on it (hq ADR 0240, to-be 48 Phase A)
The gate judged a module by what the mesh saw from outside, so a container that
crash-looped after it applied passed it. Each machine's node-engine now states
the health of every long-running resource it runs; the controller keeps the
newest statement per machine, raises module.<module>.<machine>.unhealthy on the
second statement in a row, clears it on the first that does not say it, and the
gate passes a module only when every long-running resource of it is stated
healthy since the send. An engine that states nothing is judged as before.
2026-10-07 02:28:16 +02:00
jochen 9c714f00d6 Judge every pull request against the mesh that runs, before it merges (hq ADR 0237, to-be 45 §9)
Every check the mesh had ran after a merge, on a machine: a manifest the node-engine refused
(236), an identity a real machine's name made too long (263). merge-gate raises the mesh as the
facts snapshot says it is and the mesh with the change, each in a throwaway store through the
controller's own records, composes every machine twice and validates it with the node-engine's
validator, and fails what the change breaks, naming the machine's roles and the module - plus a
manifest the judging controller cannot read, a consumer left out of its grant, a module removed
while a machine runs it, a new module the node-engine would refuse; it warns on a wide rebuild.

The forge's new head of a pull request becomes a check the controller asks of the build seat:
the head and, beside it, the controller the mesh runs, the catalogue, the host and the lab; a
throwaway store and bus of the versions the mesh runs; the repository's merge-check.sh in the
mesh's Go toolchain with no container runtime socket; then mesh-lab's replays. The verdict is
said as checked, an error never a pass, and nothing is recorded or registered.
2026-10-06 21:11:26 +02:00
jochen 68009b16fe Hear what providers retire, and let a person approve, reject and delete (hq ADR 0230)
A provider now waits for a person before retiring more than three consumers
or half of what it holds, and deletes only when asked. The controller is that
person's way in: it keeps waiting and rejected sets as conditions, answers them
with retire approve|reject, lists and deletes retired consumers through the
provider's own tools on its machine, records each act in the hand-act log, and
probes for anything retired longer than thirty days (D11).
2026-10-06 14:41:15 +02:00
jochen 2eb9a22c24 Act under a lease, keep accounts by order, one writer at composition (hq to-be 45 Phase 2)
Two controllers could both act (issue 204), a reconcile's report could
overtake the apply after it and the digest decided (issue 267), and a grant
could make a second writer of a machine's report.

- The lease (internal/lease, ADR 0229): mesh-controller_lease key `holder`,
  15 s age, renewed every 5 s by compare-and-set; the epoch is the revision
  it was taken at. The gate is the clock (stops 3 s before expiry); a refused
  renewal is a loss and the process exits; a holder that stops gives it back.
  serve takes it before asserting the bus. Epochs kept in the store
  (migration 0068 controller_epoch) as a floor: a bucket raised from nothing
  is compacted past it. Unleased (no epoch, S12 urgent) only when nobody
  holds it and the bus will not let it be written. A shell command acts
  under the holder's epoch, or its own lease when none.
- Declarations carry `epoch` inside the signed envelope, only to a machine
  whose latest account carried a report_sequence (mesh-host #35); would-send
  is composed with the epoch last sent. Allot and the send both pass the gate.
- Reports: contract in internal/link/order.go (epoch, sequence,
  report_sequence, older_than, refused_older). Accounts kept by epoch, then
  sequence, then report sequence; older refused, counted; unordered reports
  keep the digest rule. Plans by compare-and-set on a revision, with epoch.
  Conditions and calls carry the epoch and are not written off the lease.
- S12 and S13 (naming the writer by epoch) watched, D5 run; reset of the
  bucket said. Writers table compiled in and enforced in PermissionsFor; the
  controller no longer publishes mesh.control.>. A contract per consumed
  kind, and the empty-on-error lint over the repository.
- mesh-host pinned to its main with the epoch in the validator (D1 validates
  the envelope as sent).

Needs mesh-host's genesis lock with the lease grant (mesh-host PR) for
TestTheInstallersFirstUserListIsWhatTheControllerWouldCompose.
2026-10-06 12:29:18 +02:00