Commit Graph
5 Commits
Author SHA1 Message Date
mesh-tools 3208aa0461 Take the catalogue, overlay and validator from mesh-sdk in cmd/mesh-controller, p to s (issue 1381, 3 of 6 import swaps) 2026-10-20 08:24:43 +00:00
jschoubben 66dc501fc4 Split the unit level from the integration level in cmd, builder, link, catalogue, inventory; cheap fixtures for the archive-entry bound, the registry waits and the catalogue copy (issue 895) 2026-10-17 21:32:23 +02:00
jschoubben 5b455b8a24 Keep the first-machine gate behind a switch for walks begun before hq ADR 0360, and test both paths
mesh/delivery superseded: a newer head of the same pull request
mesh/merge-gate head 5b455b8a2438 merged into trunk 76304d9db817 — pass: builds mesh-controller → novox; no bus step; every machine composes with the chang…
mesh/repo-check head 5b455b8a2438 merged into trunk 76304d9db817 — fail: its merge-check.sh failed: --- FAIL: TestARenewalWrittenThoughItsAnswerWasLostIsSt…
2026-10-14 19:35:07 +02:00
jochen 9a7ae131cb TestReplay336 reads the bus call in its mesh form
mesh/merge-gate pass: builds build-agent, mesh-controller, route-proxy → ace, g14, novox, shanks; no bus step; every machine composes with the change as it…
mesh/repo-check pass: its merge-check.sh passed
mesh/delivery superseded: a newer head of the same pull request
The previous commit named the upgrade as a mesh call, and the replay still looked for the command-line
words; it now asserts the seat and the upgrade, as any wording of the call says them.
2026-10-09 03:08:21 +02:00
jochen 1fdc68a8aa Tell the operator at once when sends wait for the bus's planned step, and say it before the merge (hq issue 336)
mesh/merge-gate pass: builds build-agent, mesh-controller, route-proxy → ace, g14, novox, shanks; no bus step; every machine composes with the change as it…
mesh/repo-check pass: its merge-check.sh passed
mesh/delivery superseded: a newer head of the same pull request
For 28 minutes on 2026-10-08 every send to the control-node was refused for a new bus build that only a
person's bus upgrade moves, and no condition said so: the refusal lived only in each walk's note, and S3
would have called it lateness after half an hour, in words that named neither the bus nor the verb.

- Row S17, bus.<module>.step-waiting: raised on the first watchdog tick after a walk's send is refused for
  the bus, for the operator, naming the machines, what waits, the bus build from and to, since when and
  mesh-controller.bus upgrade. It clears once the bus's machine runs the build the mesh holds.
- S3 leaves out a walk held only by the bus's step.
- A change that builds the bus says in its delivery plan and summary (which mesh/merge-gate carries) that
  merging it needs a person's bus upgrade, and that nothing else reaches its machine until then.
- TestReplay336 fails on the commit before and passes on this one.
2026-10-09 02:33:57 +02:00