Commit Graph
8 Commits
Author SHA1 Message Date
jochen 150f038ff8 Read a module whole while a plan has overtaken its build source, and plan every view alike (hq ADR 0267, review)
A failed build, or a plan closed before reaching a module, left the
closure its last good build said, and a fix-forward to a newly imported
package would have moved nothing. A missed merge moving only a module
that packages the repository was never caught up, and an older merge
read as history for it through a look that was not its own. The gate,
a pull request's check, the what-if and a delivery's order now read the
same view the merge handler does.
2026-10-10 03:20:36 +02:00
jochen a011743c69 Raise the mesh as it is in the gate, call a baseline that does not compose an error, and let a check run by hand as the seat runs it
mesh/merge-gate pass: builds build-agent, mesh-controller, route-proxy → ace, g14, novox, shanks; no bus step; every machine composes with the change as it…
mesh/repo-check pass: its merge-check.sh passed
mesh/delivery superseded: a newer head of the same pull request
The gate composed 0 of 4 machines with the change and without, and passed every change: the store it
raised held each module's bus credential but no account for it (issue 203's refusal), no outward links
(so no filter could be composed), and refused settings the mesh holds. Now the account is minted with
its credential, the facts carry each machine's outward links (a stand-in for an older snapshot), the
mesh's layers are kept as held, and a withheld path keeps a path's shape. A machine the mesh composes
that the gate cannot raise makes the verdict an error, never a pass; the verdict alone is on stdout.

A merge-check.sh that passed on an agent's machine failed on the build seat: a newer gofmt, siblings at
a feature branch, another user. `mesh-controller check-here` runs builder.Check with the ask the
controller would make, from facts that now name the toolchains and the refs cloned beside; a failed
script is said by what failed. (novox/hq issues 282, 283)
2026-10-07 01:33:18 +02:00
jochen 487aa040de Let a walk wait for its delivery's word, and serve the delivery's owner (hq ADR 0239)
mesh/merge-gate pass: every machine composes with the change as it did without (0 of 4 compose)
mesh/delivery delivered
mesh/delivery-group group feat/mesh-delivery delivered: every member is delivered
While the mesh-delivery seat has a holder on record, a merge that moves no
core module opens its walk and asks nothing until mesh-delivery or a person
says go; nothing of it is registered before its turn, so no other send
carries it. The controller keeps the planner, the gate, sending and the
walk, and gains the verbs the owner asks with: delivery-plan, -order,
-check (a group composed as one future state), deliver, delivery-stop,
delivery-walks; every walk kept is said as plan-moved.
2026-10-07 00:01:42 +02:00
jochen 3d05d74400 Publish only a commit on its module's trunk; post a pull request's change plan (hq ADR 0238)
mesh/merge-gate pass: the change touches no module of the mesh's graph
mesh/delivery delivered
mesh/delivery-group group feat/the-graph-decides-what-is-checked delivered: every member is delivered
One commit, one plan: a commit off the trunk — a pull request's head, a branch built by
hand, a rebuild or replay of one — is for checking. The build seat reads from its clone
which branches hold the commit, and the controller records and never registers a build
whose commit is not on the branch the module follows (the repository's default for a
new one), so nothing off the trunk can be sent.

A pull request's check now carries its change plan, computed by the planner: what a
merge would build in which order, what each machine would receive, and what is not an
ordinary send — the bus step, a module waiting for a person, a provider's consumers.
2026-10-06 22:49:55 +02:00
jochen 58ebe590a5 Ask the planner what a pull request reaches; map a changed file onto modules in one place (hq ADR 0238)
touchedBy is now the only mapping of changed files onto modules — touched, added, and
read by no build — and reachOfMerge the planner's whole answer with the dependency walk.
The merge handler, the plan what-if, the merge gate's width and composition, and a pull
request's check all ask it, so planning and gating cannot disagree. The gate composes
the definitions of the modules a merge would rebuild or add, not every one in the tree,
and the check says the dependents a merge would build after them.
2026-10-06 22:34:57 +02:00
jochen b24bb030ec A changed file touches exactly the modules whose build reads it (hq issue 280, ADR 0237)
The builder reads a module's own directory (the repository for one built from its root)
and a repository its recipe packages, nothing else. A file in no module's directory was
read as shared code and rebuilt everything built from the repository: 103 modules for a
merge-check.sh added at the catalogue's root. It now touches nothing, in the merge
handler, the release planner and the pull request's check alike, and the gate says so.
2026-10-06 22:34:57 +02:00
jochen 14127d4878 Let the module graph decide what a pull request's check runs, in two layers (hq ADR 0237)
Every pull request the forge announces is mapped onto the mesh's module graph by the
merge handler's rule (issue 278): touching a module — or adding one — runs the gate
(mesh/merge-gate), its judge chosen by the graph (the controller judges itself, the
node-engine by its validator); a repository of the mesh that touches none runs only its
own merge-check.sh (mesh/repo-check), a warning when it has none. Nothing is left pending:
a repository outside the mesh touching nothing is told so as a pass.

The gate moves out of the per-repository scripts into the build seat, so a script is the
repository's own tests and declares its toolchain (go or typescript). The controller's
manifest names every verb of its seat again (ADR 0132), held by a test.
2026-10-06 22:34:56 +02:00
jochen 9c714f00d6 Judge every pull request against the mesh that runs, before it merges (hq ADR 0237, to-be 45 §9)
Every check the mesh had ran after a merge, on a machine: a manifest the node-engine refused
(236), an identity a real machine's name made too long (263). merge-gate raises the mesh as the
facts snapshot says it is and the mesh with the change, each in a throwaway store through the
controller's own records, composes every machine twice and validates it with the node-engine's
validator, and fails what the change breaks, naming the machine's roles and the module - plus a
manifest the judging controller cannot read, a consumer left out of its grant, a module removed
while a machine runs it, a new module the node-engine would refuse; it warns on a wide rebuild.

The forge's new head of a pull request becomes a check the controller asks of the build seat:
the head and, beside it, the controller the mesh runs, the catalogue, the host and the lab; a
throwaway store and bus of the versions the mesh runs; the repository's merge-check.sh in the
mesh's Go toolchain with no container runtime socket; then mesh-lab's replays. The verdict is
said as checked, an error never a pass, and nothing is recorded or registered.
2026-10-06 21:11:26 +02:00