mesh/merge-gate head f09c5ebdec6c merged into trunk 584aa2d7d7a5 — pass: builds build-agent, mesh-controller → ace, g14, novox, shanks; no bus step; every …
The operator's rule: a wait is never hard-coded, at most a default is configured. The push verb takes `wait`; without it the controller's setting `push-wait` (module default 2m) applies; a setting that cannot be read waits for nothing, as a push did before, and says so.
mesh/merge-gate head 6d2e4c299a34 merged into trunk 584aa2d7d7a5 — pass: builds mesh-controller → novox; no bus step; every machine composes with the chang…
The seat ran `push <node> --wait 0`, so a push's call ended at "sent" and nobody learned whether the machine applied it. The caller is answered before a push starts (answersFirst, issue 265), so waiting holds nobody: the call now waits up to two minutes for the machine's own report and keeps it, applied, refused with the machine's reason, or each failed resource with its error.
mesh/merge-gate pass: builds build-agent, mesh-controller, route-proxy → ace, g14, novox, shanks; no bus step; every machine composes with the change as it…
Two incidents had one shape: a change took effect that nobody saw first (hq issues 241, 304).
Three guards, each silent when nothing is at stake:
- settings show [--history], and a set that answers each key it adds, changes and removes, and
refuses a removal unless --replace; the replaced or cleared layer is kept in settings_history,
in the same transaction as the write (migration 0078).
- every send keeps a summary of what it sent (no file content), plan <node> --diff compares with
it, and push with no machine is refused unless --all.
- a push that would give a running container's mount another host directory holds that machine,
naming the module, mount and both directories, until push <node> --move <module>; a named push's
cascade is held the same way.
Rebased onto main and fitted to it: the hold runs before the push says what it recreates, a whole
push still says so first and leaves machines waiting for a gate, the verb's push with no machine is
still --behind and a push still needs why. The verbs take plan diff, settings replace and history,
and push move beside a machine, each refused where it cannot take effect.