jochen 2eb9a22c24 Act under a lease, keep accounts by order, one writer at composition (hq to-be 45 Phase 2)
Two controllers could both act (issue 204), a reconcile's report could
overtake the apply after it and the digest decided (issue 267), and a grant
could make a second writer of a machine's report.

- The lease (internal/lease, ADR 0229): mesh-controller_lease key `holder`,
  15 s age, renewed every 5 s by compare-and-set; the epoch is the revision
  it was taken at. The gate is the clock (stops 3 s before expiry); a refused
  renewal is a loss and the process exits; a holder that stops gives it back.
  serve takes it before asserting the bus. Epochs kept in the store
  (migration 0068 controller_epoch) as a floor: a bucket raised from nothing
  is compacted past it. Unleased (no epoch, S12 urgent) only when nobody
  holds it and the bus will not let it be written. A shell command acts
  under the holder's epoch, or its own lease when none.
- Declarations carry `epoch` inside the signed envelope, only to a machine
  whose latest account carried a report_sequence (mesh-host #35); would-send
  is composed with the epoch last sent. Allot and the send both pass the gate.
- Reports: contract in internal/link/order.go (epoch, sequence,
  report_sequence, older_than, refused_older). Accounts kept by epoch, then
  sequence, then report sequence; older refused, counted; unordered reports
  keep the digest rule. Plans by compare-and-set on a revision, with epoch.
  Conditions and calls carry the epoch and are not written off the lease.
- S12 and S13 (naming the writer by epoch) watched, D5 run; reset of the
  bucket said. Writers table compiled in and enforced in PermissionsFor; the
  controller no longer publishes mesh.control.>. A contract per consumed
  kind, and the empty-on-error lint over the repository.
- mesh-host pinned to its main with the epoch in the validator (D1 validates
  the envelope as sent).

Needs mesh-host's genesis lock with the lease grant (mesh-host PR) for
TestTheInstallersFirstUserListIsWhatTheControllerWouldCompose.
2026-10-06 12:29:18 +02:00
jochen e11caecdad Let two controllers overlap safely while one hands over to the other (hq issue 213)
The controller's machine moves it from the container to a process by
starting the process first and removing the container once the process
is up (mesh-host's `replaces`). For that moment two controllers share the
store and the bus. Checked what each does:

- the seat's verbs: a queue group per seat, each call answered once. Safe.
- the controller's consumers on CONTROL and EVENTS: push consumers with
  no delivery group, so the second bind is refused with "consumer is
  already bound" and serve exited. The process would restart for ever,
  the host would never see it up, and the container would never go. The
  second controller now stands by and binds when the first lets go
  (tested on a real bus; fails without the change).
- plans: read, changed and saved whole by the 30s timer, by build
  outcomes, by a merge and by `plans stop`. Two timers would each ask a
  tier the other had just asked. Working the plans now takes a
  session-level advisory lock on the inventory: the timer skips while
  another holds it, the other paths wait for it. Build asks happen only
  inside plan work and are covered by the same lock.
2026-10-04 01:11:26 +02:00