Two controllers could both act (issue 204), a reconcile's report could
overtake the apply after it and the digest decided (issue 267), and a grant
could make a second writer of a machine's report.
- The lease (internal/lease, ADR 0229): mesh-controller_lease key `holder`,
15 s age, renewed every 5 s by compare-and-set; the epoch is the revision
it was taken at. The gate is the clock (stops 3 s before expiry); a refused
renewal is a loss and the process exits; a holder that stops gives it back.
serve takes it before asserting the bus. Epochs kept in the store
(migration 0068 controller_epoch) as a floor: a bucket raised from nothing
is compacted past it. Unleased (no epoch, S12 urgent) only when nobody
holds it and the bus will not let it be written. A shell command acts
under the holder's epoch, or its own lease when none.
- Declarations carry `epoch` inside the signed envelope, only to a machine
whose latest account carried a report_sequence (mesh-host #35); would-send
is composed with the epoch last sent. Allot and the send both pass the gate.
- Reports: contract in internal/link/order.go (epoch, sequence,
report_sequence, older_than, refused_older). Accounts kept by epoch, then
sequence, then report sequence; older refused, counted; unordered reports
keep the digest rule. Plans by compare-and-set on a revision, with epoch.
Conditions and calls carry the epoch and are not written off the lease.
- S12 and S13 (naming the writer by epoch) watched, D5 run; reset of the
bucket said. Writers table compiled in and enforced in PermissionsFor; the
controller no longer publishes mesh.control.>. A contract per consumed
kind, and the empty-on-error lint over the repository.
- mesh-host pinned to its main with the epoch in the validator (D1 validates
the envelope as sent).
Needs mesh-host's genesis lock with the lease grant (mesh-host PR) for
TestTheInstallersFirstUserListIsWhatTheControllerWouldCompose.
The controller's machine moves it from the container to a process by
starting the process first and removing the container once the process
is up (mesh-host's `replaces`). For that moment two controllers share the
store and the bus. Checked what each does:
- the seat's verbs: a queue group per seat, each call answered once. Safe.
- the controller's consumers on CONTROL and EVENTS: push consumers with
no delivery group, so the second bind is refused with "consumer is
already bound" and serve exited. The process would restart for ever,
the host would never see it up, and the container would never go. The
second controller now stands by and binds when the first lets go
(tested on a real bus; fails without the change).
- plans: read, changed and saved whole by the 30s timer, by build
outcomes, by a merge and by `plans stop`. Two timers would each ask a
tier the other had just asked. Working the plans now takes a
session-level advisory lock on the inventory: the timer skips while
another holds it, the other paths wait for it. Build asks happen only
inside plan work and are covered by the same lock.