mesh/merge-gate pass: builds build-agent, mesh-controller → ace, g14, novox, shanks; no bus step; every machine composes with the change as it did without …
A head checked again through mesh-delivery reached the direct verdict with no
base head, so a head no build judges was answered with no trunk commit and the
merge tool would refuse it (novox/hq ADR 0323).
mesh/merge-gate pass: builds build-agent, mesh-controller, route-proxy → ace, g14, novox, shanks; no bus step; every machine composes with the change as it…
A change touching no module, in a repository with no merge-check.sh, was
answered by the controller with no trunk commit, so the merge tool refused it,
asked again and refused it for ever (novox/mesh-tools-go; novox/hq ADR 0323).
A check judged the head alone, so two pull requests that each passed could
break the trunk together (node-engine #66 on 2026-10-09), and a recheck after
the trunk moved judged the same head again. The build seat now merges the head
into the trunk's head in its own clone, never pushed, fails a head that does not
merge cleanly naming the files, and the verdict names the head, the trunk
commit and the commits read beside it, for the forge and mesh-delivery to weigh
against the trunk's next move (novox/hq ADR 0323, issue 341).
One commit, one plan: a commit off the trunk — a pull request's head, a branch built by
hand, a rebuild or replay of one — is for checking. The build seat reads from its clone
which branches hold the commit, and the controller records and never registers a build
whose commit is not on the branch the module follows (the repository's default for a
new one), so nothing off the trunk can be sent.
A pull request's check now carries its change plan, computed by the planner: what a
merge would build in which order, what each machine would receive, and what is not an
ordinary send — the bus step, a module waiting for a person, a provider's consumers.
touchedBy is now the only mapping of changed files onto modules — touched, added, and
read by no build — and reachOfMerge the planner's whole answer with the dependency walk.
The merge handler, the plan what-if, the merge gate's width and composition, and a pull
request's check all ask it, so planning and gating cannot disagree. The gate composes
the definitions of the modules a merge would rebuild or add, not every one in the tree,
and the check says the dependents a merge would build after them.
The builder reads a module's own directory (the repository for one built from its root)
and a repository its recipe packages, nothing else. A file in no module's directory was
read as shared code and rebuilt everything built from the repository: 103 modules for a
merge-check.sh added at the catalogue's root. It now touches nothing, in the merge
handler, the release planner and the pull request's check alike, and the gate says so.
Every pull request the forge announces is mapped onto the mesh's module graph by the
merge handler's rule (issue 278): touching a module — or adding one — runs the gate
(mesh/merge-gate), its judge chosen by the graph (the controller judges itself, the
node-engine by its validator); a repository of the mesh that touches none runs only its
own merge-check.sh (mesh/repo-check), a warning when it has none. Nothing is left pending:
a repository outside the mesh touching nothing is told so as a pass.
The gate moves out of the per-repository scripts into the build seat, so a script is the
repository's own tests and declares its toolchain (go or typescript). The controller's
manifest names every verb of its seat again (ADR 0132), held by a test.