Commit Graph
13 Commits
Author SHA1 Message Date
jschoubben 66dc501fc4 Split the unit level from the integration level in cmd, builder, link, catalogue, inventory; cheap fixtures for the archive-entry bound, the registry waits and the catalogue copy (issue 895) 2026-10-17 21:32:23 +02:00
jschoubben 5b455b8a24 Keep the first-machine gate behind a switch for walks begun before hq ADR 0360, and test both paths
mesh/delivery superseded: a newer head of the same pull request
mesh/merge-gate head 5b455b8a2438 merged into trunk 76304d9db817 — pass: builds mesh-controller → novox; no bus step; every machine composes with the chang…
mesh/repo-check head 5b455b8a2438 merged into trunk 76304d9db817 — fail: its merge-check.sh failed: --- FAIL: TestARenewalWrittenThoughItsAnswerWasLostIsSt…
2026-10-14 19:35:07 +02:00
jschoubben c3946e5d72 Pass the node-engine and resolver on their third reading, at most two minutes
mesh/delivery superseded: a newer head of the same pull request
mesh/merge-gate head c3946e5d72c2 merged into trunk bff5b7f0e4f8 — pass: builds build-agent, mesh-controller → ace, g14, novox, shanks; no bus step; every …
mesh/repo-check head c3946e5d72c2 merged into trunk bff5b7f0e4f8 — fail: its merge-check.sh failed: --- FAIL: TestACoreBehindWhileTheNodeToolsSettleFailsNo…
The operator wants these gates as fast as they can be: counting readings only after
two minutes added about 80 s to every node-engine rollout for no safety. Count
from the send, pass on the third healthy reading, and pass a module healthy at
every reading at two minutes on what it has (novox/hq ADR 0352).
2026-10-13 22:55:46 +02:00
jschoubben 524295926f Pass the controller's first-node gate on one reading after the witness window
mesh/delivery superseded: a newer head of the same pull request
mesh/merge-gate head 524295926f76 merged into trunk bff5b7f0e4f8 — pass: builds build-agent, mesh-controller → ace, g14, novox, shanks; no bus step; every …
mesh/repo-check head 524295926f76 merged into trunk bff5b7f0e4f8 — fail: its merge-check.sh failed: --- FAIL: TestACoreBehindWhileTheNodeToolsSettleFailsNo…
The controller runs on one machine, so three readings over two minutes guarded no
other machine and held every walk behind it. Judge each module by its own rule:
one reading for the controller and the tool runner once the node-engine's witness
window has ended, one for mesh-delivery, three for the node-engine and the
resolver with the first two minutes after the send (novox/hq ADR 0351). The
gate's verdict names the rule it applied.
2026-10-13 22:39:32 +02:00
jschoubben d8ec8baa22 Judge a send on no machine as the core, and test a send carrying the core with the real classes
mesh/merge-gate pass: builds build-agent, mesh-controller, route-proxy → ace, g14, novox, shanks; no bus step; every machine composes with the change as it…
mesh/repo-check pass: THE CHANGE ALTERS ITS OWN CHECK (merge-check.sh): main's version judged it; the change's judges the pull requests after it merges; it…
mesh/delivery delivered
The review found that a send whose first machine runs none of its
modules would pass at once with no reading, and that every mixed send
in the tests judged its leaf as the core.
2026-10-12 01:38:09 +02:00
jschoubben ad3b4f185b Judge a leaf module on one healthy reading, a core module on three (hq issue 524)
mesh/merge-gate pass: builds build-agent, mesh-controller → ace, g14, novox, shanks; no bus step; every machine composes with the change as it did without …
mesh/repo-check pass: THE CHANGE ALTERS ITS OWN CHECK (merge-check.sh): main's version judged it; the change's judges the pull requests after it merges; it…
mesh/delivery superseded: a newer head of the same pull request
ADR 0282 decided readings by class and ADR 0304 took a leaf module to
one, but the gate never learned it: every build, leaf or core, needed
three readings over at least two minutes, so a container module that
was healthy at once still waited about two and a half minutes on its
first machine. The number of readings and the settle time now follow
the module's class: three after two minutes for the controller's own
path and the resolver, one for every other module. Tests that judge a
gate's other rules keep leaf modules on three readings.
2026-10-12 01:08:14 +02:00
jschoubben e6e1e3bc89 A gate judges its own send and the build it sent, and never puts the controller back behind its store (hq issue 352)
mesh/merge-gate pass: builds build-agent, mesh-controller, route-proxy → ace, g14, novox, shanks; no bus step; every machine composes with the change as it…
mesh/repo-check pass: its merge-check.sh passed
mesh/delivery delivered
On 2026-10-09 a release's gate on the control node read the machine's
report against a newer send another plan had just made there, failed
three builds the machine had reported healthy, and put them back on
every machine to a controller older than the store's schema; that
controller then passed the newer plan's gate from its own health.

- A gate keeps what its send carried (digest, sequence) and reads the
  report against it; a report on the last send is on it too.
- A gate judges only the build the machine was last sent: another build
  there supersedes the judging — no verdict, nothing put back.
- A controller is told its build (MESH_CONTROLLER_VERSION, ${version}
  in a process's env) and records how far it reads the store's schema;
  a put-back to a build that reaches less, or never said, is refused
  and the current build kept, said as urgent.
- A release's open gate holds other sends of its modules there, and a
  plan's own first send waits on it.
2026-10-09 17:15:40 +02:00
jochen a5e8baf6da Register a module only from the repository the catalogue builds it from
An agent could make a repository of its own, or fork one the mesh builds
from, commit a module.json naming sudo or mesh-host, and ask the build verb
for it: the outcome was registered under that name, and the next push made
whoever wrote it root on every node (novox/hq ADR 0266 §7, the review of
2026-10-09). The trunk rule checked the trunk of the repository built, which
was the agent's.

The take-in, which every outcome reaches whichever verb asked it, now
registers a module only from its registered repository, and a new module only
from a repository the catalogue already builds from (a merge adding one);
anything else only when the build request was kept as asked at the
controller's terminal (migration 0084). Through a verb, a build of a
repository the catalogue builds nothing from is not asked at all.
2026-10-09 12:37:18 +02:00
jochen 1cc6a2d759 Keep what each machine says of what it runs, raise it, and gate on it (hq ADR 0240, to-be 48 Phase A)
The gate judged a module by what the mesh saw from outside, so a container that
crash-looped after it applied passed it. Each machine's node-engine now states
the health of every long-running resource it runs; the controller keeps the
newest statement per machine, raises module.<module>.<machine>.unhealthy on the
second statement in a row, clears it on the first that does not say it, and the
gate passes a module only when every long-running resource of it is stated
healthy since the send. An engine that states nothing is judged as before.
2026-10-07 02:28:16 +02:00
jochen 37229b4db5 Refuse every send that would replace the bus outside its planned step (hq ADR 0236)
A plan's send to the bus's machine for another module carried the bus's new build and
restarted it under every machine with nobody asking (2026-10-06). The guard is in the one
send everything uses; only the bus step passes it. A rebuild that made the same artifacts
is no move.
2026-10-06 18:56:54 +02:00
jochen d7bf1bae83 Name the decision this builds: hq ADR 0236 (0235 is the bus's snapshot) 2026-10-06 18:56:54 +02:00
jochen c6f3d8cdfa Take the bus's snapshot through its machine's backup holder before the planned step (hq ADR 0235, 0236) 2026-10-06 18:56:54 +02:00
jochen d9289ef6d4 Gate a release plan's first machine and roll a failed build back there (hq ADR 0236)
A build that reported applied was sent everywhere; one that then did nothing, served
no tools or broke its machine's word reached every machine. Now the first machine is
judged by the component's health (the core's definitions, as doctor probes H-*, or a
module's own) three times over two minutes within ten; a failing gate puts the previous
build back there once, marks the build, and says it as a condition and an event.
Upgrades roll out by default; the bus is a planned step; a module deleted at its
source is not built (the public-acme plan failure).
2026-10-06 18:56:54 +02:00