Commit Graph
4 Commits
Author SHA1 Message Date
mesh-tools bfe7fe1530 Pin mesh-sdk at 14fd5cb6 (R4a's merge) and take the catalogue, overlay and validator from it, s to inventory (issue 1381, 4 of 6 import swaps)
go.mod and go.sum move to mesh-sdk 14fd5cb68fd1, the commit on its main that holds go/catalogue, go/overlay and go/validate (ADR 0453 clause 2); vendor/modules.txt follows in the last of the six commits.
2026-10-20 08:26:01 +00:00
mesh-tools c07f604047 Make the rollout tests wait for the plan look to return before their cleanups restore what it reads, which raced (issue 1338)
mesh/merge-gate head c07f604047be merged into trunk 70cb217601f9 — pass: builds build-agent, mesh-controller, route-proxy → ace, g14, novox, shanks; no bus…
mesh/repo-check head c07f604047be merged into trunk 70cb217601f9 — pass: its merge-check.sh passed
mesh/delivery delivered
2026-10-19 23:23:23 +00:00
jschoubben 1ec27e6ba1 Read tier 1's build and the note once the plan has reached them in the silent middle tier test (issue 1160)
mesh/merge-gate head 1ec27e6ba18f merged into trunk 461fa9c7b4ed — pass: builds mesh-controller → novox; no bus step; every machine composes with the chang…
mesh/repo-check head 1ec27e6ba18f merged into trunk 461fa9c7b4ed — pass: its merge-check.sh passed
mesh/delivery covered after its stop: a later merge that contains it was delivered: novox/mesh-controller@75a27ec1a4bc (merged as b1cfb85f into main, wal…
2026-10-18 21:24:07 +02:00
jschoubben 425134784a A machine silent past the bound at a tier between the first and the last is named and left as it was, as at the last tier (issue 1160) 2026-10-18 21:15:48 +02:00