Commit Graph
5 Commits
Author SHA1 Message Date
jochen 106507b1d3 Show and change the build queue through the controller, and have plans follow it (hq ADR 0219)
Nothing showed what waited for a build machine, and an ask could not be
dropped without leaving the plan that made it waiting for ever. New verbs:
queue, cancel, clear, rebuild, replay, kill, pause, resume, and plans retry.
Every ask a person drops is recorded failed through the same take-in as a
failed build; a plan keeps the id it asked each module under and matches
its outcome by it. replay is a dry run unless registered, and registering
an older commit than one registered since needs --older (hq issue 207).
A plan waiting on a seat paused on every holder says so and is not late;
a failed plan can be retried, and a rebuild joins the plan holding the
module instead of running beside it.
2026-10-05 19:17:56 +02:00
jochen 208901c6cc Let a newer plan supersede the older open plans of its repository (hq issue 254, ADR 0218)
A merge planned without looking at open plans, so two plans worked the
same modules and a stuck plan stayed open for ever. The newer plan folds
in what older plans of the same repository and branch had not built or
sent, and closes them as superseded. A person can close a stuck plan by
id with `plans close <id>`.
2026-10-05 18:17:52 +02:00
jochen 4ac5cfe3a7 Roll a plan's module out to one machine first (hq issue 249, ADR 0218)
A plan sent every machine running a module at once, ignoring the module's
upgrade policy. Unless the policy says together, the first machine by name
is sent, recorded in the plan, and the rest follow only once its report
after the send says it applied; a failed first machine stops the plan.
2026-10-05 18:17:52 +02:00
jschoubben 3ca1f5d26a A plan sends what it waits for
A tier whose module a later tier is built by waited for the machines running it to report after the
build — and relied on the catalogue's moved event to send them. A rebuild from the same source commit is
not a move the catalogue announces: the build machine rebuilt for a controller change kept its commit,
nothing sent it, and the plan waited on a report that would never come (2026-10-01, 19:45Z). The plan
now sends the machines running a gated module once, records when, and waits for the reports after that.
2026-10-01 21:54:40 +02:00
jschoubben a69a832248 A merge produces a tiered plan the mesh keeps (hq ADR 0162)
A module's dependencies are one relation in the catalogue — stands-on, packages, built-by, declared —
answered by one call. A merge takes what moved and everything reachable from it, sorts the set into
tiers (a code dependency in the same tier, a build dependency after its base is built, a runtime
dependency after the build machine is built and running; the build machine's own base comes first,
built by the one that runs), writes the plan to the store, asks the first tier and returns. Every
outcome advances the plan; a ticker advances what outcomes cannot; a controller replaced mid-plan
resumes it. status lists open plans and names one that has waited too long.
2026-10-01 17:53:55 +02:00