mesh/merge-gate head 185d0294ebd4 merged into trunk 89abce5df955 — pass: builds build-agent, mesh-controller → ace, g14, novox, shanks; no bus step; the ch…
mesh/delivery covered after its stop: a later merge that contains it was delivered: novox/mesh-controller@0b312218f90f (merged as 791786d5 into main, wal…
mesh/check pass 185d0294ebd4 on 89abce5df955 | unit 1756 run, 0 kept, 4 skipped | integration 3034 run, 0 kept, 16 skipped | over bound: integration (…
The checker's integration store answers on a unix socket named in the query of MESH_TEST_POSTGRES
(?host=<socket dir>&sslmode=disable). The identity, inventory and licences fixtures cut the address at
its last slash and appended ?sslmode=disable, dropping host=, so pgx dialled its default socket where no
server is: every store test waited out its 20 s readiness bound, each package ran into go test's
10-minute timeout, and the verdict named only the first failure,
identity.TestACertificateChainsToTheMeshsOwnAuthority.
store.DatabaseForTest now builds that address for every fixture, keeping the query as the template raise
already did; identity's fresh is ForTest rather than a second copy. The readiness bound and its error,
which wraps the driver's cause, are unchanged.
Running ~90 migrations into a fresh database per store test, and bcrypt at
the default cost under the race detector, were most of the controller's
check (novox/hq issue 591).
Review of the ADR 0105 build (hq ADR 0105). Four things it got wrong and one
path it lacked:
- A predecessor spoke's tunnel names one peer, the hub, routed the whole
range; recording refused it and the whole enrolment failed. Range-routed
peers are skipped now — only the hub's peers are ever carried.
- The range and the carried peers were conditions on the node being adopted,
so converging the hub would have renumbered the mesh and dropped the peers
still reaching it. They are facts of the tunnel record now, mode aside; the
takeover alone is declared to an adopted node. Converging the hub is refused
while a carried peer has not enrolled, naming it.
- A push composed a takeover for a hub whose address or endpoint disagreed
with the tunnel, which would have the host stop the found interface and
raise the mesh's where no peer listens. The graph refuses to compose it,
naming both and the placement that fixes it.
- The host's account said taken or not; "found down and the mesh's not up"
read as not taken. Three states now, and an account on every takeover.
- A hub that enrolled before this feature holds a key of its own, and
re-enrolling would rotate every key the mesh sealed credentials to. A node
now rekeys in a report, signed with its identity key over the key it
leaves, the key it takes and the tunnel; the mesh verifies against the live
key, refuses a stale or foreign proof, records key and tunnel, and moves a
hub to the tunnel's address. `overlay show` names the path for a hub that
found no tunnel.
Also: a carried IPv6 peer is routed /128, and identity.ForTest exists so the
link can be tested against a real identity store.