Commit Graph
4 Commits
Author SHA1 Message Date
mesh-tools 4c84ac992b Take the catalogue, overlay and validator from mesh-sdk in cmd/mesh-controller, g to p (issue 1381, 2 of 6 import swaps) 2026-10-20 08:23:26 +00:00
jschoubben 66dc501fc4 Split the unit level from the integration level in cmd, builder, link, catalogue, inventory; cheap fixtures for the archive-entry bound, the registry waits and the catalogue copy (issue 895) 2026-10-17 21:32:23 +02:00
jschoubben 5b455b8a24 Keep the first-machine gate behind a switch for walks begun before hq ADR 0360, and test both paths
mesh/delivery superseded: a newer head of the same pull request
mesh/merge-gate head 5b455b8a2438 merged into trunk 76304d9db817 — pass: builds mesh-controller → novox; no bus step; every machine composes with the chang…
mesh/repo-check head 5b455b8a2438 merged into trunk 76304d9db817 — fail: its merge-check.sh failed: --- FAIL: TestARenewalWrittenThoughItsAnswerWasLostIsSt…
2026-10-14 19:35:07 +02:00
jochen d9b86376d3 A no-move tier waits for no new report, so its walk asks the next tier (issue 648)
A build made from the source every machine running it runs is marked sent
and sent nothing, yet the tier's wait asked each machine for a report after
that marking. None follows, and the walk waited for ever. Each machine is
now judged by whether it answered its last send, the one whose builds made
the build no move.
2026-10-14 02:18:53 +02:00